Reference Hub6
A Methodology to Bridge Information Gap in ERP Implementation Life Cycle

A Methodology to Bridge Information Gap in ERP Implementation Life Cycle

Tripti Negi, Veena Bansal
Copyright: © 2013 |Volume: 9 |Issue: 2 |Pages: 13
ISSN: 1548-1115|EISSN: 1548-1123|EISBN13: 9781466632707|DOI: 10.4018/jeis.2013040104
Cite Article Cite Article

MLA

Negi, Tripti, and Veena Bansal. "A Methodology to Bridge Information Gap in ERP Implementation Life Cycle." IJEIS vol.9, no.2 2013: pp.70-82. http://doi.org/10.4018/jeis.2013040104

APA

Negi, T. & Bansal, V. (2013). A Methodology to Bridge Information Gap in ERP Implementation Life Cycle. International Journal of Enterprise Information Systems (IJEIS), 9(2), 70-82. http://doi.org/10.4018/jeis.2013040104

Chicago

Negi, Tripti, and Veena Bansal. "A Methodology to Bridge Information Gap in ERP Implementation Life Cycle," International Journal of Enterprise Information Systems (IJEIS) 9, no.2: 70-82. http://doi.org/10.4018/jeis.2013040104

Export Reference

Mendeley
Favorite Full-Issue Download

Abstract

ERP packages are complex in nature. Requirements Engineering (RE) and Configuration can be termed as two knowledge phases in an ERP implementation. During RE, needs and requirements of various stakeholders are identified and documented. Configuration phase uses information generated by RE phase. Hence the RE techniques should be able to capture configuration specific requirements. But it turns out that RE techniques do not capture configuration specific information completely. Thus, there is a gap between the information captured during RE phase and the information required for configuration. To minimize this gap, a solution called Data Activity Model for Configuration (DAMC) is proposed. It is validated by professionals mainly consultants and program managers for various ERP vendors.

Request Access

You do not own this content. Please login to recommend this title to your institution's librarian or purchase it from the IGI Global bookstore.