Critical Risk Path Method: A Risk and Contingency-Driven Model for Construction Procurement in Complex and Dynamic Projects

Critical Risk Path Method: A Risk and Contingency-Driven Model for Construction Procurement in Complex and Dynamic Projects

Chi Iromuanya, Kathleen M. Hargiss, Caroline Howard
Copyright: © 2013 |Volume: 4 |Issue: 2 |Pages: 13
ISSN: 1947-3095|EISSN: 1947-3109|EISBN13: 9781466632790|DOI: 10.4018/jsita.2013040105
Cite Article Cite Article

MLA

Iromuanya, Chi, et al. "Critical Risk Path Method: A Risk and Contingency-Driven Model for Construction Procurement in Complex and Dynamic Projects." IJSITA vol.4, no.2 2013: pp.61-73. http://doi.org/10.4018/jsita.2013040105

APA

Iromuanya, C., Hargiss, K. M., & Howard, C. (2013). Critical Risk Path Method: A Risk and Contingency-Driven Model for Construction Procurement in Complex and Dynamic Projects. International Journal of Strategic Information Technology and Applications (IJSITA), 4(2), 61-73. http://doi.org/10.4018/jsita.2013040105

Chicago

Iromuanya, Chi, Kathleen M. Hargiss, and Caroline Howard. "Critical Risk Path Method: A Risk and Contingency-Driven Model for Construction Procurement in Complex and Dynamic Projects," International Journal of Strategic Information Technology and Applications (IJSITA) 4, no.2: 61-73. http://doi.org/10.4018/jsita.2013040105

Export Reference

Mendeley
Favorite Full-Issue Download

Abstract

Existing approaches to risk management in construction procurement primarily dwell on strategies designed for commonly identifiable risk factors in typical project environments. Commonly identifiable risk factors would include too early or late material delivery - a condition typically ameliorated by implementing a Just In Time (JIT) plan; inferior construction materials typically mitigated by employing trusted vendors; or ineffective contractors primarily avoided by the use of experienced contractors. The purpose of this paper is to present a coherent model for procurement risk management for construction and infrastructure development projects within the context of dynamic project environments - complex, or chaotic. For the purpose of this study, a critical risk path activity is one in which a delay of activity completion not only leads to project delay, but does so in a manner that may be fatal to project or at best, far greater than the actual delay. The study incorporates observations and theory with practical application for improving initiatives by emergency infrastructure development response organizations such as FEMA (Federal Emergency Management Agency) and USACE (US Army Corps of Engineers) in the United States, the NEMA (National Emergency Management Agency) in Nigeria, or ANDMA (Afghanistan National Disaster Management Authority) etc. This study presents risk response plans aimed at improving the potential occurrence of positive risk aspects while reducing, or eliminating the same for negative risk occurrences. This study explored material, equipment, and skilled labor procurement strategies related to project risk management from the perspectives of scheduling, cost, and quality - three factors often referred to as the triple project constraints. It identified gaps within specific national and multinational organizations’ approaches, and provided detailed recommendations for process improvements from the procurement management perspective to ensure the potential for successful project outcomes in unstable project conditions.