Abstract
This paper studies the resource-constrained project scheduling problem with fuzzy activity duration and fuzzy deadline. On the basis of the concept of schedule robustness for fuzzy deadline and fuzzy project makespan, we seek for a schedule that maximizes the schedule robustness. First, An efficient genetic algorithm (GA) based on activity list representation is proposed for solving this problem, the performance of our GA and GA based on the priority value representation is compared. Second, we study the impact for the two different weak comparison rules (integral value method, distance method) in the performance of GA. The computational experiment shows that the performance of the proposed GA is better than GA appearing in the literature, there is no significant difference between the two weak comparison rules on the Performance of the algorithm.
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling: A Research Handbook. Kluwer Academic Publishers, Dordrecht (2002)
Hartmann, S.: Project Scheduling Under Limited Resources: Models, Methods and Applications. Springer, Berlin (1999)
Lootsma, F.A.: Stochastic and Fuzzy PERT. European Journal of Operational Research 43, 174–183 (1989)
Fortemps, P.: Jobshop Scheduling with Imprecise Durations: A Fuzzy Approach. IEEE Transactions on Fuzzy Systems 5, 557–569 (1997)
Hapke, M., Slowinski, R.: A DSS for Resource-Constrained Project Scheduling under Uncertainty. Decision Systems 2, 111–128 (1993)
Hapke, M., Jaszkiewicz, A., Slowinski, R.: Fuzzy Project Scheduling System for Software Development. Fuzzy Sets and Systems 21, 101–117 (1994)
Hapke, M., Slowinski, R.: Fuzzy Priority Heuristics for Project Scheduling. Fuzzy Sets and Systems 83, 291–299 (1996)
Pan, H., Yeh, C.-H.: Fuzzy Project Scheduling. In: The IEEE International Conference on Fuzzy Systems, pp. 755–760 (2003)
Wang, J.: A Fuzzy Project Scheduling Approach to Minimize Schedule Risk for Product Development. Fuzzy Sets and Systems 127, 99–116 (2002)
Wang, J.: A Fuzzy Robust Scheduling Approach for Product Development Projects. European Journal of Operational Research 152, 180–194 (2004)
Cheng, C.-H.: New Approach for Ranking Fuzzy Numbers by Distance Method. Fuzzy Sets and Systems 95, 307–317 (1998)
Liou, T.-S., Wang, M.-J.: Ranking Fuzzy Numbers with Integral Value. Fuzzy Sets and Systems 50, 247–255 (1992)
Kolish, R., Sprecher, A.: PSPLIB–A Project Scheduling Problem Library. European Journal of Operational Research 96, 205–216 (1996)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2005 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Wang, H., Lin, D., Li, M. (2005). A Genetic Algorithm for Solving Fuzzy Resource-Constrained Project Scheduling. In: Wang, L., Chen, K., Ong, Y.S. (eds) Advances in Natural Computation. ICNC 2005. Lecture Notes in Computer Science, vol 3612. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11539902_20
Download citation
DOI: https://doi.org/10.1007/11539902_20
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-28320-1
Online ISBN: 978-3-540-31863-7
eBook Packages: Computer ScienceComputer Science (R0)