Skip to main content

Partner Selection for Renewable Resources in Construction Supply Chain

  • Conference paper
Intelligent Computing (ICIC 2006)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 4113))

Included in the following conference series:

  • 1640 Accesses

Abstract

Partner selection is an important problem in supply chain management. The renewable resources suppliers are the most immediate partners for contractor in construction supply chain and their capacity will form constraints to project scheduling. The mathematical model for selecting these suppliers in construction projects is proposed and the principle to reduce the solution space is discussed. Following that, a schema with a hybrid genetic algorithm(GA) to solve the problems is designed wherein chromosome is composed of two parts: one represents partner selection, the other is an activities chain with precedence relationship, and different genetic operators are set on them respectively. Finally, an example is given to show the effectiveness of the algorithm.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Weber, C.A., Current, J.R., Benton, W.C.: Vendor Selection Criteria and Methods. European Journal of Operational Research 50, 2–18 (1991)

    Article  Google Scholar 

  2. Liu, X., Li, H.Y., Wang, C.E.: A Survey of Supplier Selection Models and Approaches. Chinese Journal of Management Science 1, 139–148 (2004)

    Google Scholar 

  3. Wang, D.W., Yung, K.L., Lp, W.H.: Partner Selection Model and Soft Computing Approach for Dynamic Alliance of Enterprises. Science in China(Series F) 6, 68–80 (2002)

    Google Scholar 

  4. Wang, D.W., Ip, W.H., Yung, K.L.: A Heuristic Genetic Algorithm for Subcontractor Selection in a Global Manufacturing Environment. IEEE Transactions on Systems Man and Cybernetics Part C-Applications and Reviews 2, 189–198 (2001)

    Article  Google Scholar 

  5. Ip, W.H., Huang, M., Yung, K.L., et al.: Genetic Algorithm for a Risk-based Partner Selection Problem in a Virtual Enterprise. Computers and Operations Research 2, 213–231 (2002)

    Google Scholar 

  6. Dainty, R.J., Geoffrey, B., Millett, S.: New Perspectives on Construction Supply Chain Integration. Supply Chain Management: An International Journal 4, 163–173 (2001)

    Article  Google Scholar 

  7. Wang, Y.W., Xue, X.L.: Improving Construction Performance through Supply Chain Management. Journal of Harbin Institute of Technology(New Series) 5, 528–532 (2004)

    Google Scholar 

  8. Liu, Z.Y., Wang, H.W.: GA-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities’ Cost. In: Huang, D.-S., Zhang, X.-P., Huang, G.-B. (eds.) ICIC 2005. LNCS, vol. 3644, pp. 937–946. Springer, Heidelberg (2005)

    Chapter  Google Scholar 

  9. Kolisch, R., Sprecher, A.: PSPLIB-A Project Scheduling Problem Library. European Journal of Operational Research 1, 205–216 (1996)

    Google Scholar 

  10. Zhou, M., Sun, S.D.: The Principle and Application of Genetic Algorithm. Defence Industry Press, China (1999)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2006 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Liu, Z., Wang, H. (2006). Partner Selection for Renewable Resources in Construction Supply Chain. In: Huang, DS., Li, K., Irwin, G.W. (eds) Intelligent Computing. ICIC 2006. Lecture Notes in Computer Science, vol 4113. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11816157_102

Download citation

  • DOI: https://doi.org/10.1007/11816157_102

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-37271-4

  • Online ISBN: 978-3-540-37273-8

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics