Abstract
Deterministic models for project scheduling and control suffer from the fact that they assume complete information and neglect random influences that occur during project execution. A typical consequence is the underestimation of the expected project duration and cost frequently observed in practice. This phenomenon occurs even in the absence of resource constraints, and has been the subject of extensive research in discrete mathematics and operations research.
This article presents a survey on the reasons for this phenomenon, its complexity, and on methods how to obtain more relevant information. this end, we consider scheduling models with fixed precedence constraints, but (independent) random processing times. The objective then is to obtain information about the distribution of the project makespan. We will demonstrate that this is an #\( \mathcal{P} \) -complete problem in general, and then consider several combinatorial methods to obtain approximate information about the makespan distribution.
Supported by Deutsche Forschungsgemeinschaft under grant Mo 346/3-3 and by German Israeli Foundation under grant I-564-246.06/97
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
V. Adlakha and V. Kulkarni. A classified bibliography of research on stochastic PERT networks: 1966-1987. INFOR, 27(3):272–296, 1989.
K. P. Anklesaria and Z. Drezner. A multivariate approach to estimating the completion time for PERT networks. J. Opl. Res. Soc., 40:811–815, 1986.
W. W. Bein, J. Kamburowski, and M. F. M. Stallmann. Optimal reduction of two-terminal directed acyclic graphs. SIAM J. Comput., 21:1112–1129, 1992.
B. Dodin. Determining the k most critical paths in PERT networks. Oper. Res., 32(859–877), 1984.
B. Dodin. Bounding the project completion time distribution in PERT networks. Oper. Res., 33:862–881, 1985.
D. R. Fulkerson. Expected critical path lengths in PERT networks. Oper. Res., 10:808–817, 1962.
D. I. Golenko. Statistische Methoden der Netzplantechnik. B. G. Teubner, Stuttgart, 1972.
J. N. Hagstrom. Computational complexity of PERT problems. Networks, 18:139–147, 1988.
U. Heller. On the shortest overall duration in stochastic project networks. Methods Oper. Res., 42:85–104, 1981.
G. Kleindorfer. Bounding distributions for a stochastic acyclic network. Oper. Res., 19:1586–1601, 1971.
M. S. Krishnamoorthy and N. Deo. Complexity of the minimum-dummy-activities problem in a PERT network. Networks, 9:189–194, 1979.
A. Ludwig, R. H. Möhring, and F. Stork. A computational study on bounding the makespan distribution in stochastic project networks. Technical Report 609, Technische Universität Berlin, Fachbereich Mathematik, Berlin, Germany, 1998. appear in and Annals of Oper. Res.
J. J. Martin. Distribution of the time through a directed acyclic network. Oper. Res., 13:46–66, 1965.
I. Meilijson and A. Nadas. Convex majorization with an application to the length of critical paths. J. Appl. Prob., 16:671–677, 1979.
R. H. Möhring. Computationally tractable classes of ordered sets. In I. Rival, editor, Algorithms and Order, Nato Advanced Study Institutes Series, pages 105–193. D. Reidel Publishing Company, Dordrecht, 1989.
R. H. Möhring. Scheduling under uncertainty: Optimizing against a randomizing adversary. In K. Jansen and S. Khuller, editors, Approximation Algorithms for Combinatorial Optimization, Proceedings of the Third International Workshop APPROX 2000, Saarbrücken, pages 15–26. Springer-Verlag, Lecture Notes in Computer Science, vol. 1913, 2000.
R. H. Möhring and R. Müller. A combinatorial approach to bound the distribution function of the makespan in stochastic project networks. Technical Report 610, Technische Universität Berlin, Fachbereich Mathematik, Berlin, Germany, 1998.
R. H. Möhring and F. J. Radermacher. The order-theoretic approach to scheduling: The stochastic case. In R. SOlowiński and J. Wceglarz, editors, Advances in Project Scheduling, pages 497–531. Elsevier Science B. V., Amsterdam, 1989.
V. Naumann. Measuring the distance to series-parallelity by path expressions. In E. W. Mayr, G. Schmidt, and G. Tinhofer, editors, Proceedings 20th International Workshop on Graph-Theoretic Concepts in Computer Science WG’94, pages 269–281. Springer-Verlag, Lecture Notes in Computer Science, vol. 903, 1995.
J. S. Provan and M. O. Ball. The complexity of counting cuts and of the probability that a graph is connected. SIAM J. Comput., 12:777–788, 1983.
D. Sculli and Y. W. Shum. An approximate solution to the PERT problem. Computers and Mathematics with Applications, 21:1–7, 1991.
A. W. Shogan. Bounding distributions for a stochastic PERT network. Networks, 7:359–381, 1977.
H. G. Spelde. Stochastische Netzpläne und ihre Anwendung im Baubetrieb. PhD thesis, Rheinisch-Westfälische Technische Hochschule Aachen, 1976.
K. Takamizawa, T. Nishizeki, and N. Saito. Linear-time computability of combinatorial problems on series-parallel graphs. J. Assoc. Mach., 29:623–641, 1982.
J. Valdes, R. E. Tarjan, and E. L. Lawler. The recognition of series-parallel digraphs. SIAM J. Comput., 11:298–314, 1982.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2001 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Möhring, R.H. (2001). Scheduling under Uncertainty: Bounding the Makespan Distribution. In: Alt, H. (eds) Computational Discrete Mathematics. Lecture Notes in Computer Science, vol 2122. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-45506-X_7
Download citation
DOI: https://doi.org/10.1007/3-540-45506-X_7
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-42775-9
Online ISBN: 978-3-540-45506-6
eBook Packages: Springer Book Archive