Abstract
Consider the question often asked in software development: Whyproduct 10 times faster than one engineer? Effort and schedule arerelationship. What function is the additional effort serving ifThis extra effort is generally referred to as overhead. The primarycomplexity of developing many pieces concurrently and integrating
Assuming software schedules will not become less demanding, theon minimizing the overhead associated with adding more people.
The overhead can be minimized by using a development process modelnication and tracking capabilities as well as configurationnisms during the initial and rework phases of a project.
Such a model was defined and implemented by our company by addingmanagement, communication and integration mechanisms to thetion Management) 3.0 and CaseWare/PT (Problem Tracking) 3.0model was used and improved on several projects and contributedof the projects.
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Parker, Karen, “Reducing Software Schedules with a Processtem” 1995
CaseWare, Inc., “CaseWare User's Guide”, Part Number
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 1995 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Parker, K. (1995). Customization of a commercial CM system to provide better management mechanisms. In: Estublier, J. (eds) Software Configuration Management. SCM SCM 1993 1995. Lecture Notes in Computer Science, vol 1005. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-60578-9_27
Download citation
DOI: https://doi.org/10.1007/3-540-60578-9_27
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-60578-2
Online ISBN: 978-3-540-47768-6
eBook Packages: Springer Book Archive