Abstract
We analyze a dual resource constrained (DRC) job shop in which both machines and workers are limited, and we seek to minimize L max, the maximum job lateness. An allocation of workers to machine groups is required to generate a schedule, and determining a schedule that minimizes L max is NP-hard. This chapter details a probabilistic method for evaluating the quality of a specific (but arbitrary) allocation in a given DRC job shop scheduling problem based on two recent articles by Lobo et al. (2013a) The first article Lobo et al. (2013b) describes a lower bound on L max given an allocation, and an algorithm to find an allocation yielding the smallest such lower bound, while the second article Lobo et al. (2013b) establishes criteria for verifying the optimality of an allocation. For situations where the optimality criteria are not satisfied, Lobo et al. (2013c) presents HSP, a heuristic search procedure to find allocations enabling the Virtual Factory (a heuristic scheduler developed by Hodgson et al. in 1998) to generate schedules with smaller L max than can be achieved with allocations yielding article 1’s final lower bound. From simulation replications of the given DRC job shop scheduling problem, we estimate the distribution of the difference between (a) the “best” (smallest) L max value achievable with a Virtual Factory–generated schedule, taken over all feasible allocations; and (b) the final lower bound of Lobo et al. (2013b). To evaluate the quality of a specific allocation for the given problem, we compute the difference between L max for the Virtual Factory–generated schedule based on the specific allocation, and the associated lower bound (b) for the problem; then we refer this difference to the estimated distribution to judge the likelihood that the specific allocation yields the Virtual Factory’s “best” schedule (a) for the given problem. We present several examples illustrating the usefulness of our approach, and summarize the lessons learned in this work.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391–401.
Bickel, P. J., & Doksum, K. A.. (2007). Mathematical Statistics: Basic Ideas and Selected Topics (2nd edn.). Upper Saddle River, Pearson Prentice Hall.
Coles, S. (2001). An Introduction to Statistical Modeling of Extreme Values. Springer, London.
Derigs, U. (1985). Using confidence limits for the global optimum in combinatorial optimization. Operations Research, 33(5), 1024–1049.
Felan, J., Fry, T., & Philipoom, P. (1993). Labour flexibility and staffing levels in a dual-resource constrained job shop. International Journal of Production Research, 31(10), 2487–2506.
Gargeya, V., Deane, R. (1996). Scheduling research in multiple resource constrained job shops: A review and critique. International Journal of Production Research, 34(8), 2077–2097.
Geer Mountain Software Corp. (2001). Stat::Fit, Version 2. South Kent, Geer Mountain Software Corp.
Golden, B. L., & Alt, F. B. (1979). Interval estimation of a global optimum for large combinatorial problems. Naval Research Logistics Quarterly, 26(1), 69–77.
Hodgson, T., Cormier, D., Weintraub, A., & Zozom, A. (1998). Satisfying due dates in large job shops. Management Science, 44(10), 1442–1446.
Hodgson, T., King, R., Thoney, K., Stanislaw, N., Weintraub, A., & Zozom, A. (2000). On satisfying due-dates in large job shops: Idle time insertion. IIE Transactions, 32, 177–180.
Hodgson, T., Melendez, B., Thoney, K., & Trainor, T. (2004). The deployment scheduling analysis tool (DSAT). Mathematical and Computer Modelling, 39(6-8), 905–924.
Hottenstein, M., & Bowman, S. (1998). Cross-training and worker flexibility: A review of DRC system research. The Journal of High Technology Management Research, 9(2), 157–174.
Jaber, M., & Neumann, W. (2010). Modelling worker fatigue and recovery in dual-resource constrained systems. Computers & Industrial Engineering, 59(1), 75–84.
Kelton, W. D., Sadowski, R. P., & Swets, N. B.. (2010). Simulation with Arena 4th edn. New York, McGraw-Hill.
Kher, H. (2000). Examination of flexibility acquisition policies in dual resource constrained job shops with simultaneous worker learning and forgetting effects. The Journal of the Operational Research Society, 51(5), 592–601.
Kher, H., Malhotra, M., Philipoom, P., & Fry, T. (1999). Modeling simultaneous worker learning and forgetting in dual resource constrained systems. European Journal of Operational Research, 115(1), 158–172.
Kuhl, M., Ivy, J., Lada, E., Steiger, N., Wagner, M., & Wilson, J. (2010). Univariate input models for stochastic simulation. Journal of Simulation, 4, 81–97.
Law, A. M (2007). Simulation Modeling and Analysis. McGraw-Hill, New York, 4th edn.
Law, A. M. (2011). How the ExpertFit distribution-fitting software can make your simulation models more valid. In Proceedings of the 2011 Winter Simulation Conference, S. Jain, R. R. Creasy, J. Himmelspach, K. P. White, & M. Fu (eds.) Institute of Electrical and Electronics Engineers (pp. 63–69). New Jersey, Piscataway.
Leadbetter, M. R., Lindgren, G., & Rootzén, H. (1983). Extremes and Related Properties of Random Sequences and Processes. New York, Springer-Verlag.
Lenstra, J., & Rinnooy Kan, A. (1979). Computational complexity of discrete optimization problems. In Discrete Optimization I Proceedings of the Advanced Research Institute on Discrete Optimization and Systems Applications of the Systems Science Panel of NATO and of the Discrete Optimization Symposium, P. Hammer, E. Johnson, and B. Korte, eds., Elsevier, vol. 4 of Annals of Discrete Mathematics. 121–140.
Lobo, B., Hodgson, T., King, R., Thoney, K., & Wilson, J. (2013a). An effective lower bound on \(L\rm \max\) in a worker-constrained job shop. Computers & Operations Research, 40(1), 328–343.
Lobo, B., Hodgson, T., King, R., Thoney, K., & Wilson, J. (2013b). Allocating job-shop manpower to minimize \(L\rm \max\) in a job shop: Optimality criteria, search heuristics, and probabilistic quality metrics. Computers & Operations Research, 40(10), 2569–2584.
Lobo, B., Wilson, J., Thoney, K., Hodgson, T., & King, R. (2013c). A practical method for evaluating worker-allocations in large-scale dual resource constrained job shops. http://people.engr.ncsu.edu/bjlobo/papers/loboetal_paper4.pdf.
Malhotra, M., Fry, T., Kher, H., & Donohue, J. (1993). The impact of learning and labor attrition on worker flexibility in dual resource constrained job shops. Decision Sciences, 24(3), 641–664.
Nelson, R. (1967). Labor and machine limited production systems. Management Science, 13(9), 648–671.
Park, S., & Miller K (1988) Random number generators: good ones are hard to find. Communications of the ACM, 31(10), 1192–1201.
Pinedo, M. (2012). Scheduling: Theory, Algorithms, and Systems, (4th edn). Springer
Schultz, S., Hodgson, T., King, R., & Thoney, K. (2004). Minimizing \(L\rm \max\) for large-scale, job-shop scheduling problems. International Journal of Production Research, 42(23), 4893–4907.
Scott, D. (1979). On optimal and data-based histograms. Biometrika, 66(3), 605–610.
Thoney, K., Hodgson, T., King, R., Taner, M., & Wilson, A. (2002). Satisfying due-dates in large multi-factory supply chains. IIE Transactions, 34(9), 803–811.
Treleven, M. (1989). A review of the dual resource constrained system research. IIE Transactions, 21(3), 279–287.
Treleven M, & Elvers D. (1985). An investigation of labor assignment rules in a dual-constrained job shop. Journal of Operations Management, 6(1), 51–68.
Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: a link between process planning and scheduling. IIE Transactions, 31(11), 1093–1102.
Wilson, A. D., King, R. E., & Wilson, J. R. (2004). Case study on statistically estimating minimum makespan for flow line scheduling problems. European Journal of Operational Research, 155, 439–454.
Zozom, A., Hodgson, T., King, R., Weintraub, A., & Cormier, D. (2003). Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates. International Journal of Production Research, 41(1), 31–45.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer Science+Business Media New York
About this chapter
Cite this chapter
Lobo, B., Thoney, T., King, R., Wilson, J. (2014). A Probabilistic Characterization of Allocation Performance in a Worker-Constrained Job Shop. In: Pulat, P., Sarin, S., Uzsoy, R. (eds) Essays in Production, Project Planning and Scheduling. International Series in Operations Research & Management Science, vol 200. Springer, Boston, MA. https://doi.org/10.1007/978-1-4614-9056-2_13
Download citation
DOI: https://doi.org/10.1007/978-1-4614-9056-2_13
Published:
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4614-9055-5
Online ISBN: 978-1-4614-9056-2
eBook Packages: Business and EconomicsBusiness and Management (R0)