Skip to main content

Development of the Mechanism of Risk-Adjusted Scheduling and Cost Budgeting of R&D Projects in Telecommunications

  • Conference paper
  • First Online:
Internet of Things, Smart Spaces, and Next Generation Networks and Systems (NEW2AN 2018, ruSMART 2018)

Abstract

We developed the mechanism of risk-adjusted scheduling and cost budgeting of research and development (R&D) projects in telecommunication. The relevance of this topic is explained by growing complexity and uncertainty of innovation activity; high importance of cost and time as key metrics of R&D projects’ performance. The paper addresses decreasing efficiency of existing mechanisms which poorly incorporate risks and fills the gaps in the research in this area. Results included development of the concept of the mechanism, its block diagram, the specification of its comprising tools, the step-by-step description of its phases. Unlike the “conventional” peers, the developed mechanism allows timely identification of uncertainties; facilitates robust and transparent evaluation of risks; focuses management efforts on key threats; and ensures remediation of risks earlier in the process thus improving speed and quality of decision making. These advantages let us conclude that the suggested mechanism should have a significant practical use.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

Notes

  1. 1.

    Research performed by Dos Santos [9] revealed that in the United States 80% of R&D projects failed before completion while among the survivors 49% exceeded expected costs; almost 63% of these projects ran late.

References

  1. Glukhov, V., Balashova, E.: Economics and Management in Infocommunication: Tutorial. Piter, Saint Petersburg (2012)

    Google Scholar 

  2. Guseva, I., Covyrzina, K.: The algorithm of the R&D management and control involving controlling system. Controlling 53, 50–56 (2014)

    Google Scholar 

  3. Nekrasova, T.P., Aksenova, E.E.: Economic Evaluation of Investments in Telecommunication Industry. St. Petersburg State Polytechnical University, Saint Petersburg (2011)

    Google Scholar 

  4. Sazonov, A., Dzhamay, V., Povekvechnykh, S.: Analysis of efficiency of implementation of CALS technologies on the example of domestic aviation. Organizator proizvodstva (Organ. Prod.) 26(1), 84–92 (2018)

    Google Scholar 

  5. Suloeva, S., Gultceva, O.: Complex R&D cost management system. Organizator proizvodstva 25(4), 57–66 (2017)

    Google Scholar 

  6. Moody’s telecommunication industry outlook. https://www.moodys.com/Pages/rr003_0.aspx?bd=00300300B&ed=&rd=00300300B&tb=0&po=0&sb=&sd=&lang=en&cy=global&searchfrom=SearchWithin&kw=Telecom. Accessed 01 May 2018

  7. Deloitte: Technology, Media and Telecommunications Predictions (2018). https://www2.deloitte.com/cn/en/pages/technology-media-and-telecommunications/articles/tmt-predictions-2018.html. Accessed 01 May 2018

  8. Grekul, V., Korovkina, N., Kuprianov, Y.: Project Management in Information Technology Sphere, 2nd edn. BINOM Laboratory of Knowledge, Moscow (2015)

    Google Scholar 

  9. Dos Santos, F., Cabral, S.: FMEA and PMBoK applied to project risk management. J. Inf. Syst. Technol. Manag. 5(2), 347–364 (2008)

    Google Scholar 

  10. Zhe, X., Jing, Y., Hogobo, L.: Analyzing integrated cost-schedule risk for complex R&D project. J. Appl. Math. 1, 2–12 (2014)

    Google Scholar 

  11. Mikhailova, E., Remizova, N.: Budgeting in organizations which develop the tools for aviation complexes. Electron. J. Trydi Mai 69, 24–29 (2013)

    Google Scholar 

  12. Sviridenko, V.: Complex cost management system in industrial enterprises. St. Petersburg State Polytechnical Univ. J. Econ. 4(199), 59–65 (2014)

    Google Scholar 

  13. Carbone, T., Tippett, D.: Project risk management using the project risk FMEA. Eng. Manag. J. 16(4), 28–35 (2004)

    Article  Google Scholar 

  14. Bekleshov, V., Zavlin, P.: Norming in Research and Development Organizations. Economica, Moscow (1989)

    Google Scholar 

  15. Luppino, R., Hosseini, M., Rameezdeen, R.: Risk management in research and development projects. The case of South Australia. Asian Acad. Manag. J. 19(2), 67–85 (2014)

    Google Scholar 

  16. Grichounine, S.: Developing the mechanism of qualitative risk assessment in strategic controlling. St. Petersburg State Polytechnical Univ. J. Econ. 10(2), 64–74 (2017)

    Google Scholar 

  17. Batkovskiy, A., Konovalova, A., Semenova, E., Trofimets, V., Fomina, A.: Risks of development and implementation of innovative projects. Mediterr. J. Soc. Sci. 6(4), 243–253 (2015)

    Google Scholar 

  18. Isidore, L., Back, W.: Probabilistic optimal-cost scheduling. J. Constr. Eng. Manag. 127(6), 431–437 (2001)

    Article  Google Scholar 

  19. Grishunin, S., Suloeva, S.: Strategic controlling and anti-crisis management. In: Strategy and Tactics of Anti-Crisis Management of a Firm. Specialnaya Literatura, Saint-Petersburg (1996)

    Google Scholar 

  20. Taylor, B.: Project management using GERT analysis. Proj. Manag. Q. 9(3), 15–20 (1978)

    Google Scholar 

  21. Wyrozębski, P., Wyrozębska, A.: Challenges of project planning in the probabilistic approach using PERT, GERT and Monte Carlo. J. Manag. Mark. 1(1), 101–107 (2003)

    Google Scholar 

  22. Grishunin, S., Mukhanova, N., Suloeva, S.: Development of concept of risk controlling for industrial enterprise. Organizator proizvodstva 26(1), 45–56 (2018)

    Google Scholar 

  23. Sidorenko, A., Demidenko, E.: Guide to effective risk management 2.0, URL: https://www.risk-academy.ru/en/download/risk-management-book. Accessed 07 May 2018

  24. Pleskunov, M.: The Tasks of Network Planning: Tutorial. The Publishing House of Urals University, Ekaterinburg (2014)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Sergei Grishunin or Svetlana Suloeva .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Grishunin, S., Suloeva, S., Nekrasova, T. (2018). Development of the Mechanism of Risk-Adjusted Scheduling and Cost Budgeting of R&D Projects in Telecommunications. In: Galinina, O., Andreev, S., Balandin, S., Koucheryavy, Y. (eds) Internet of Things, Smart Spaces, and Next Generation Networks and Systems. NEW2AN ruSMART 2018 2018. Lecture Notes in Computer Science(), vol 11118. Springer, Cham. https://doi.org/10.1007/978-3-030-01168-0_41

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-01168-0_41

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-01167-3

  • Online ISBN: 978-3-030-01168-0

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics