The paper is concerned with the two-machine flow shop, where each job needs storage space (a buffer requirement) during the entire time of its processing. The buffer requirement is determined by the duration of job’s first operation. The goal is to minimise the time needed for the completion of all jobs. This scheduling problem is NP-hard in the strong sense even for very restricted cases such as the case with a given order of jobs processing on one of the machines. The paper contributes to the efforts of establishing the borderline between the NP-hard and polynomial-time solvable cases by proving that there exists a polynomial-time algorithm which constructs an optimal schedule if the duration of each operation does not exceed one-fifth of the buffer capacity. The presented polynomial-time algorithm is used as a basis for a heuristic for the general case. This heuristic is complemented by a Lagrangian relaxation based heuristic and a bin-packing based constructive heuristic. The heuristics are tested by computational experiments.
A. Kononov—Research of the first author is partially supported by RFBR grant 17-07-00513.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Brucker, P., Heitmann, S., Hurink, J.: Flow-shop problems with intermediate buffers. OR Spectr. 25(4), 549–574 (2003)
Brucker, P., Knust, S.: Complex Scheduling. Springer, Heidelberg (2012). https://doi.org/10.1007/978-3-642-23929-8
Coffman Jr., E.G., Garey, M.R., Johnson, D.S.: An application of bin-packing to multiprocessor scheduling. SIAM J. Comput. 7(1), 1–17 (1978)
Emmons, H., Vairaktarakis, G.: Flow Shop Scheduling. Springer, Boston (2013). https://doi.org/10.1007/978-1-4614-5152-5
Fisher, M.L.: The lagrangian relaxation method for solving integer programming problems. Manag. Sci. 50, 1861–1871 (2004)
Fung, J., Singh, G., Zinder, Y.: Capacity planning in supply chains of mineral resources. Inf. Sci. 316, 397–418 (2015)
Fung, J., Zinder, Y.: Permutation schedules for a two-machine flow shop with storage. Oper. Res. Lett. 44(2), 153–157 (2016)
Gu, H., Kononov, A., Memar, J., Zinder, Y.: Efficient lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements. J. Discrete Algorithms 52–53, 143–155 (2018)
Gu, H., Memar, J., Zinder, Y.: Scheduling batch processing in flexible flowshop with job dependent buffer requirements: lagrangian relaxation approach. In: Rahman, M.S., Sung, W.-K., Uehara, R. (eds.) WALCOM 2018. LNCS, vol. 10755, pp. 119–131. Springer, Cham (2018). https://doi.org/10.1007/978-3-319-75172-6_11
Irohara, T.: Lagrangian relaxation algorithms for hybrid flow-shop scheduling problems with limited buffers. Int. J. Biomed. Soft Comput. Hum. Sci. 15(1), 21–28 (2010)
Johnson, S.M.: Optimal two-and three-stage production schedules with setup times included. Nav. Res. Logist. Q. 1(1), 61–68 (1954)
Kononov, A., Hong, J.S., Kononova, P., Lin, F.C.: Quantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applications. J. Sched. 15(4), 487–497 (2012)
Kononova, P., Kochetov, Y.A.: The variable neighborhood search for the two machine flow shop problem with a passive prefetch. J. Appl. Ind. Math. 7(1), 54–67 (2013)
Lin, F.C., Hong, J.S., Lin, B.M.: A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations. Comput. Oper. Res. 36(4), 1158–1175 (2009)
Lin, F.C., Hong, J.S., Lin, B.M.: Sequence optimization for media objects with due date constraints in multimedia presentations from digital libraries. Inf. Syst. 38(1), 82–96 (2013)
Lin, F.C., Lai, C.Y., Hong, J.S.: Minimize presentation lag by sequencing media objects for auto-assembled presentations from digital libraries. Data Knowl. Eng. 66(3), 382–401 (2008)
Pinedo, M.L.: Scheduling: Theory, Algorithms, and Systems. Springer, New York (2012). https://doi.org/10.1007/978-1-4614-2361-4
Tang, L.X., Xuan, H.: Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers. J. Oper. Res. Soc. 57(3), 316–324 (2006)
van de Velde, S.L.: Machine scheduling and lagrangian relaxation (1991)
Witt, A., Voß, S.: Simple heuristics for scheduling with limited intermediate storage. Comput. Oper. Res. 34(8), 2293–2309 (2007)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Kononov, A., Memar, J., Zinder, Y. (2019). Flow Shop with Job–Dependent Buffer Requirements—a Polynomial–Time Algorithm and Efficient Heuristics. In: Khachay, M., Kochetov, Y., Pardalos, P. (eds) Mathematical Optimization Theory and Operations Research. MOTOR 2019. Lecture Notes in Computer Science(), vol 11548. Springer, Cham. https://doi.org/10.1007/978-3-030-22629-9_24
Download citation
DOI: https://doi.org/10.1007/978-3-030-22629-9_24
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-22628-2
Online ISBN: 978-3-030-22629-9
eBook Packages: Computer ScienceComputer Science (R0)