Abstract
The purpose of this paper is to provide a proposal of a production management model using lean manufacturing techniques to improve on-time deliveries of a metal-mechanic company that works in a make-to-order (MTO) manufacture of industrial fans environment. The proposal of the research refers to the implementation of a production management model in a metal mechanic company in Peru and analyze the effect in on-time delivery rate of the company. In one month of operation after the implementation of the pro-posed model, the on-time delivery rate of the company increased from 35% to 80%. Likewise, the problems present in the metalworking research company may be the same in many metalworking companies in the country, so the present investigation will serve as an example for the possible solution of the problems of other companies.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Morales, C.: Sector industrial cayó 6.6% en últimos tres años, Perú 21, Lima, 29 May 2017
Gestión: Industria metalmecánica caería 5.6% este año, según Maximixe, Gestión, Lima, 19 August 2016
Saldarriaga, J.: Metalmecánica prevé tres años de vacas flacas en la minería, El Comercio (2015). https://elcomercio.pe/economia/peru/metalmecanica-preve-tres-anos-vacas-flacas-mineria195491
Ramachandran, G.M., Neelakrishnan, S.: An approach to improving customer on-time delivery against the original promise date. South African J. Ind. Eng. 28, 109–119 (2017)
Karim, M.A., Samaranayake, P., Smith, A.J.R., Halgamuge, S.K.: An on-time delivery improvement model for manufacturing organisations. Int. J. Prod. Res. 48(8), 2373–2394 (2010)
Krajewski, L., Ritzman, L., Malhotra, M.: Administración de operaciones: Procesos y Cadena de Suministro. Décima Edi., Mexico (2013)
Chauhan, G., Singh, T.P.: Measuring parameters of lean manufacturing realization. Meas. Bus. Excell. 16(3), 57–71 (2012)
Bhamu, J., Sangwan, K.S.: Lean manufacturing: literature review and research issues. Int. J. Oper. Prod. Manag. 34(7), 876–940 (2014)
Serrano, I.: Análisis de la aplicabilidad de la técnica Value Stream Mapping en el rediseño de sistemas productivos, Universitat de Girona (2007)
Curillo, E., Saraguro, R., Lorente, L., Ortega, E., Machado, C.: Aplicación de herramientas de manufactura esbelta en la empresa textil Anitex, Atuntaqui, Ecuador. Rev. Obs. la Econ. Latinoam., 7 (2018)
Askin, R.G., Goldberg, J.B.: Design and Analysis of Lean Production Systems. Wiley India Pvt. Limited, Hoboken (2007)
Korytkowski, P., Wisniewski, T., Rymaszewski, S.: Multivariate simulation analysis of production leveling (heijunka) - a case study. In: IFAC Proceedings Volumes (IFAC-PapersOnline) (2013)
IndustryWeek: The IndustryWeek Best Plants. 2016 Statistical Profile, Cleveland (2017)
Sarria Yépez, M.P., Fonseca Villamarín, G.A., Bocanegra, C.C.: Modelo metodológico de implementación de lean manufacturing. Rev. EAN 83, 51–71 (2017)
Durana, P.: 5S - tool of eliminating waste in company processes. Int. J. Transp. Logist. 16, 19–24 (2016)
Czifra, G.: Implementation process of 5S for a company in real life - problems, solutions, successes. Res. Pap. Fac. Mater. Sci. Technol. Slovak Univ. Technol. 25(41), 79–86 (2017)
Gupta, S., Jain, S.K.: An application of 5S concept to organize the workplace at a scientific instruments manufacturing company. Int. J. Lean Six Sigma 6, 73–88 (2015)
Manzano, M., Soler, V.G.: Lean manufacturing implantación 5S. 3C Tecnoloigia 5, 16–26 (2016)
Runkler, T.A.: Controlling discrete manufacturing processes using Kanban and Heijunka approaches. In: IEEE International Conference on Industrial Informatics (INDIN) (2011)
Mathiyazhagan, K., Govindan, K., Noorul Haq, A.: Pressure analysis for green supply chain management implementation in Indian industries using analytic hierarchy process. Int. J. Prod. Res. 52, 188–202 (2014)
Leonardo, D.G., Sereno, B., Da Silva, D.S.A., Sampaio, M., Massote, A.A., Simões, J.C.: Implementation of hybrid Kanban-CONWIP system: a case study. J. Manuf. Technol. Manag. 28, 714–736 (2017)
Prakash, J., Chin, J.F.: Implementation of hybrid parallel Kanban-CONWIP system: a case study. Prod. Manuf. 1(1), 1–15 (2014)
Author information
Authors and Affiliations
Corresponding authors
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Kishimoto, K., Medina, G., Sotelo, F., Raymundo, C. (2020). Application of Lean Manufacturing Techniques to Increase On-Time Deliveries: Case Study of a Metalworking Company with a Make-to-Order Environment in Peru. In: Ahram, T., Taiar, R., Colson, S., Choplin, A. (eds) Human Interaction and Emerging Technologies. IHIET 2019. Advances in Intelligent Systems and Computing, vol 1018. Springer, Cham. https://doi.org/10.1007/978-3-030-25629-6_148
Download citation
DOI: https://doi.org/10.1007/978-3-030-25629-6_148
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-25628-9
Online ISBN: 978-3-030-25629-6
eBook Packages: EngineeringEngineering (R0)