Risk Assessment of Innovative Projects Based on Fuzzy Modeling

  • Conference paper
  • First Online:
Lecture Notes in Computational Intelligence and Decision Making (ISDMCI 2020)

Abstract

This article is devoted to the consideration of innovative risk assessment approach. The approach includes two stages. At the first stage, as a result of fuzzy network modeling, based on fuzzy linguistic assessments of duration and cost of the job, the size of initial investments and the projected duration of the initial period of the innovative process, using \(\beta \)-distribution, are determined. On the second, random scenarios are simulated and the possible risk is calculated. This procedure combines fuzzy estimates and the Monte Carlo simulation. Fuzzy estimates of the model parameters of possible results allow us to take into account the uncertainty of the initial information in the process of simulating random values. In this case, for modeling random variables, the Gauss membership function is used, which determines the distribution of expectations of input variables.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Abreu, A., Martins, J., Calado, J.: Fuzzy logic model to support risk assessment in innovation ecosystems. In: 13th APCA International Conference on Automatic Control and Soft Computing (CONTROLO), Ponta Delgada, Azores (2018). https://doi.org/10.1109/CONTROLO.2018.8514281

  2. Baranova, M., Khaibullina, G., Galiaksarova, G.: The use of fuzzy logic for the analysis of an investment project. Sci. Contrib. Future 6(4), 21–24 (2016)

    Google Scholar 

  3. Belyi, E., Romanova, I.: Methods of financial and commercial settlements, tutorial, UlSU, Ulyanovsk (2015)

    Google Scholar 

  4. Borisov, A., Krumberg, O., Fedorov, I.: Decision making based on fuzzy models: examples of use, knowledge, Riga (1994)

    Google Scholar 

  5. Crowey, M., Gailay, D., Mark, R.: Basics of Risk Management. Publishing House Yurayt, Moskov (2016)

    Google Scholar 

  6. Deptula, A., Knosala, R.: Risk assessment of the innovative projects implementation. Manag. Prod. Eng. Rev. 6(4), 15–25 (2015). https://doi.org/10.1515/mper-2015-0032

    Article  Google Scholar 

  7. Doskocil, R.: An evaluation of total project risk based on fuzzy logic. Bus. Theory Pract. 17(1), 23–31 (2015). https://doi.org/10.3846/btp.2016.534

    Article  Google Scholar 

  8. Dosuzheva, E.: Innovation and investment projects, their features and main forms of implementation. Internet-jornal “Sci. Sci." 7(2) (2015). http://naukovedenie.ru/PDF/125EVN215.pdf

  9. Gelfer, L.: Risk analysis features of venture investment project. Russ. Entrep. 8(8), 105–110 (2007)

    Google Scholar 

  10. Glushenko, S.: The use of a fuzzy logic mechanism for assessing the risk of investment and construction projects. Vestnik RINH 47(3), 58–67 (2014)

    Google Scholar 

  11. Golenko-Ginzburg, D.: Stochastic Network Models for Development Planning and Management. Scientific Book, Voronezh (2010)

    Google Scholar 

  12. Goncharenko, L.: Innovation Policy: Textbook. KNORUS, Moscow (2011)

    Google Scholar 

  13. Gracheva, M., Lyapina, S.: Risk Management in Innovation. UNITY-DINA, Moscow (2010)

    Google Scholar 

  14. Gruzin, N.: Modern approaches to the assessment of project risks of organizations. Internet J. “Sci.” 7(6), 1–7 (2015). https://doi.org/10.15862/68EVN615

  15. Hulett, D.: Integrated Cost-Schedule Risk Analysis, New edn. Ashgate Publishing, Surrey (2011)

    Google Scholar 

  16. Kim, Y.: Monte Carlo vs. fuzzy monte carlo simulation for uncertainty and global sensitivity analysis. Sustainability 9(4), 539 (2017). https://doi.org/10.3390/su9040539

    Article  Google Scholar 

  17. Konovalova, O.: Modern approaches to the classification of innovative risks. Vestnik Universiteta (9), 59–65 (2015)

    Google Scholar 

  18. Korshunov, V.: Economics of Organization (Enterprise). Theory and Practice. Yurayt Publishing, Moscow (2014)

    Google Scholar 

  19. Kosov, V., Livshits, V., Shakhnazarov, A.: Guidelines for the evaluation of investment projects, economics, Moscow (2000)

    Google Scholar 

  20. Kuzina, S., Kuzin, P.: Risk assessment of an innovative project by simulation method (monte carlo method), bulletin TVSU. Ser. “Econ. Manag.” ( Penza State Univ. Penza Russ) (2), 257–264 (2014)

    Google Scholar 

  21. Lambros, K., Mitropoulos, P., Prevedouros, X., Yu, E., Nathanail, A.: A fuzzy and a monte carlo simulation approach to assess sustainability and rank vehicles in urban environment. Transp. Res. Procedia 24, 296–303 (2017). https://doi.org/10.1016/j.trpro.2017.05.121

    Article  Google Scholar 

  22. Makhovikova, G., Efimova, N.: Innovation Management. Eksmo, Moskow (2010)

    Google Scholar 

  23. Matveeva, L.: Management of investment projects in conditions of risks and uncertainty: a training manual. Yurayt Publishing House, Moscow (2018)

    Google Scholar 

  24. Narendra, M.: Risk assessment is fuzzy business-fuzzy logic provides the way to assess off-site risk from industrial installations. Risk 206, 218–231 (2004)

    Google Scholar 

  25. Prodchenko, I.: Theoretical Foundations of Financial Management: Educational and Methodological Complex. MIEMP, Moscow (2013)

    Google Scholar 

  26. Sadeghi, N., Fayek, A.R., Pedrycz, W.: Fuzzy Monte Carlo simulation and risk assessment in construction. Comput.-Aided Civ. Infrastruct. Eng. 25(4), 238–252 (2010). https://doi.org/10.1111/j.1467-8667.2009.00632.x

    Article  Google Scholar 

  27. Samokhvalov, Y.: Distinctive features of using the method of analysis of hierarchies in estimating problems on the basis of metric criteria. Cybern. Syst. Anal. 40, 639–642 (2004). https://doi.org/10.1007/s10559-005-0002-2

    Article  MathSciNet  MATH  Google Scholar 

  28. Samokhvalov, Y.: Development of the prediction graph method under incomplete and inaccurate expert estimates. Cybern. Syst. Anal. 54, 75–82 (2018). https://doi.org/10.1007/s10559-018-0008-1

    Article  MathSciNet  MATH  Google Scholar 

  29. Samokhvalov, Y.: Construction of the job duration distribution in network models for a set of fuzzy expert estimates. In: Lytvynenko, V., Babichev, S., Wojcik, W., Vynokurova, O., Vyshemyrskaya, S., Radetskaya, S. (eds.) Lecture Notes in Computational Intelligence and Decision Making. ISDMCI 2019. Advances in Intelligent Systems and Computing, vol. 1020. Springer, Cham (2020). https://doi.org/10.1007/978-3-030-26474-1_8

  30. Samokhvalov, Y.: Matching of expert estimates in preference relation matrices. Upravlyayushchie Sistemy i Mashiny (6), 49–54 (2002)

    Google Scholar 

  31. Sazonov, A., Sazonova, M.: Application of the Monte Carlo method for modeling economic risks in projects. Sci. Mod. 43, 228–232 (2016)

    Google Scholar 

  32. Tah, H., Carr, V.: A proposal for construction project risk assessment using fuzzy logic. Constr. Manag. Econ. 18(4), 491–500 (2000). https://doi.org/10.1080/01446190050024905

    Article  Google Scholar 

  33. Tsarev, V.: Assessment of the Economic Efficiency of Investments. SPB, Peter (2004)

    Google Scholar 

  34. Ullah, A.: A fuzzy Monte Carlo simulation technique for sustainable society scenario (3s) simulator. In: Matsumoto, M., Masui, K., Fukushige, S., Kondoh, S. (eds.) Sustainability Through Innovation in Product Life Cycle Design. EcoProduction (Environmental Issues in Logistics and Manufacturing). pp. 601–618. Springer, Singapore (2017). https://doi.org/10.3390/su10061901

  35. Ullah, S., Shamsuzzaman, M.: Fuzzy Monte Carlo simulation using point-cloud-based probability–possibility transformation. Simul.: Trans. Soc. Model. Simul. Int. 89(7), 860–875 (2013). https://doi.org/10.1177/0037549713482174

    Article  Google Scholar 

  36. Vorontsovsky, A.: Investment Management: Investments and Investment Risks in the Real Sector of the Economy. Yurayt Publishing House, Moskow (2020)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yuri Samokhvalov .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2021 The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Samokhvalov, Y. (2021). Risk Assessment of Innovative Projects Based on Fuzzy Modeling. In: Babichev, S., Lytvynenko, V., Wójcik, W., Vyshemyrskaya, S. (eds) Lecture Notes in Computational Intelligence and Decision Making. ISDMCI 2020. Advances in Intelligent Systems and Computing, vol 1246. Springer, Cham. https://doi.org/10.1007/978-3-030-54215-3_17

Download citation

Publish with us

Policies and ethics