Abstract
This article aims to propose a method of qualitative analysis and risk management in software development project environments, using a combination of RFMEA and System Dynamics. Therefore, it was possible to analyze the main risks in software development projects from the literature review. Based on those risks, a survey was applied with experts of one of the projects of the Brazilian Civil Aviation Agency (ANAC) to estimate the probability of occurrence, impact, and detection of each risk. Through RFMEA, it was possible to identify and prioritize the project’s risks, and with Systems Dynamics, to evaluate the causal relationships among them. This is a case study and qualitative research carried out with the validation of ten risks in a total of 23, establishing the strategies and recommended actions for each one of them.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
International Organization for Standardization. ISO. ISO 31000:2018: Risk management — Guidelines (2018)
Carbone, T.A., Tippett, D.D.: Project risk management using the project risk FMEA. Eng. Manage. J. 16(4), 28–35 (2004)
Project Management Institute, 2009, PMI Practice Standard for Project Risk Management (2009)
Project Management Institute, 2017, PMBOK: Project Management Body of Knowledge (2017)
Pritchard, C.L.: “Advanced Risk — How Big is Your Crystal Ball?” Proceedings Project Management Institute Annual Seminars & Symposium, September 2000
Marujo, L.: Um Modelo Estimativo do Retrabalho utilizando Dinâmica de Sistemas para Gerenciamento de Projetos (2006). https://www.researchgate.net/publication/255651297
Lyneis, J.M., Ford, D.N.: System dynamics applied to project management: a survey, assessment, and directions for future research. Syst. Dyn. Rev. J. Syst. Dyn. Soc. 23(2–3), 157–189 (2007)
Lopes, J., Braga, J., Resende, F.M.: Systems dynamics model for decision support in risk assessment in software projects. J. Softw. Evol. Process. 27. n/a-n/a. https://doi.org/10.1002/smr.1754
Ramingwong, S., Sonchan, P.: Top Twenty Risks in Software Projects: A Content Analysis and Delphi Study (2014). https://doi.org/10.1109/ecticon.2014.6839820
Hafiz Ali Hamza, G., Saira, D., Sajida, F., Muhammad, Z., Beenish, N.: Preeminent risk factor affecting software development, pp. 1–7 (2018). https://doi.org/10.1109/icacs.2018.8333492
Júlio, M.J., Cristine, G., Hermano, M.: Risk factors in software development projects: a systematic literature review. Software Qual. J. 27, 536 (2018). https://doi.org/10.1007/s11219-018-9427-5
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2021 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Leite, L.d.S., de Farias Neto, A.R., de Lima, F.L., Chaim, R.M. (2021). Analyzing and Modeling Critical Risks in Software Development Projects: A Study Based on RFMEA and Systems Dynamics. In: Rocha, Á., Adeli, H., Dzemyda, G., Moreira, F., Ramalho Correia, A.M. (eds) Trends and Applications in Information Systems and Technologies. WorldCIST 2021. Advances in Intelligent Systems and Computing, vol 1368. Springer, Cham. https://doi.org/10.1007/978-3-030-72654-6_3
Download citation
DOI: https://doi.org/10.1007/978-3-030-72654-6_3
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-72653-9
Online ISBN: 978-3-030-72654-6
eBook Packages: Intelligent Technologies and RoboticsIntelligent Technologies and Robotics (R0)