Abstract
In recent years, production environments have gone from predictable to dynamic, therefore factors such as delivery time and a high percentage of customer satisfaction have become fundamental criteria for this new environment. Production planning and control (PPC) systems must be aligned with the new objectives of the manufacturers, however, the most popular PPC don’t satisfy their needs. This is how this article proposes a PPC model based on the Demand-Driven MRP system supported by the stages of the PDCA cycle so that it can perform optimally in dynamic environments such as make-to-order manufacturing models. As a result of the simulation in the case study, 100% compliance with deliveries on time was obtained and a reduction in lead time by 50.33%. Therefore, it is concluded that the proposed model is applicable and beneficial in this context.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Manufacturing, value added (% of GDP) | Data. Data.worldbank.org (2020). https://data.worldbank.org/indicator/NV.IND.MANF.ZS. Accessed 4 Oct 2020
Buchholz, K.: Infographic: The Global Decline of Manufacturing. Statista Infographics (2020). https://www.statista.com/chart/20148/manufacturing-value-added-as-percent-of-gdp-in-major-economies/. Accessed 4 Oct 2020
INEI: Informe TĂ©cnico - ProducciĂłn Nacional. INEI (2020)
INEI: Inform TĂ©cnico - DemografĂa Empresarial en el PerĂş (2020)
Ministerio de la ProducciĂłn: Anuario estadĂstico industrial, mipyme y comercio interno (2019)
Velasco Acosta, A.P., Mascle, C., Baptiste, P.: Applicability of demand-driven MRP in a complex manufacturing environment. Int. J. Prod. Res. 58(14), 4233–4245 (2020)
Ptak, C., Smith, C.: Manufacturing requirements planning: the four critical questions answered. TechTarget, November 2011. https://searcherp.techtarget.com/feature/Manufacturing-requirements-planning-The-four-critical-questions-answered. Accessed 25 Nov 2020
Kortabarria, A., Apaolaza, U., Lizarralde, A., Amorrortu, I.: Material management without forecasting: from MRP to demand driven MRP. J. Ind. Eng. Manag. 11(4), 632–650 (2018)
Gupta, M., Snyder, D.: Comparing TOC with MRP and JIT: a literature review. Int. J. Prod. Res. 47(13), 3705–3739 (2009)
Linares, M., Mayorga Totaitive, D.: Diseño del modelo DDMRP para la planeaciĂłn de la ProducciĂłn en la empresa Wa-ArmonĂa. Pontificia Universidad Javeriana, Bogotá, Colombia, p. 35 (2017)
Pai, R.R., Hebbar, S., Rodrigues, L.L.R.: Impact of delivery delay on the manufacturing firm inventories: a system dynamics approach. In: Proceedings of the Business Management International Conference 2015, February 2016
Arunagiri, P., Gnanavelbabu, A.: Using Lean six sigma (LSS) systems, no. September 2014 (2013)
Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A.: Demand Driven MRP: assessment of a new approach to materials management. Int. J. Prod. Res. 57(1), 166–181 (2019)
Stefansson, H., Jensson, P., Shah, N.: Procedure for reducing the risk of delayed deliveries in make-to-order production. Prod. Plan. Control 20(4), 332–342 (2009)
Flores-Andrade, K., Guardia-Miranda, R., Castro-Rangel, P., Raymundo-Ibañez, C., Perez, M.: Production management model through MPS and line balancing to reduce the non-fulfillment of orders in lingerie clothing MSEs in Peru. In: IOP Conference Series: Materials Science and Engineering, vol. 796, no. 1 (2020)
Wight, O.: Manufacturing Resource Planning: MRP II: Unlocking America’s Productivity Potential. Wiley, New York (1995)
Olhager, J.: Evolution of operations planning and control: from production to supply chains. Int. J. Prod. Res. 51, 6836–6843 (2013)
Wilson, J.: The origin of material requirements planning in Frederick W. Taylor’s planning office. Int. J. Prod. Res. 54(5), 1535–1553 (2016)
Ptak, C., Smith, C.: Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Norwalk (2016)
Dimitrescu, A., Babis, C., Alecusan, A.M., Chivu, O., Faier, A.M.: Analysis of Quality Problems in Production System Using the PDCA Instrument. Fiability Durab. 1(21), 286–292 (2018)
Kholif, A.M., Abou El Hassan, D.S., Khorshid, M.A., Elsherpieny, E.A., Olafadehan, O.A.: Implementation of model for improvement (PDCA-cycle) in dairy laboratories. J. Food Saf. 38(3), 1–7 (2018)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Franco-Quispe, D., Yauri-Tito, D., Cabel-Pozo, J., Raymundo, C. (2022). Production Planning and Control Model to Increase On-Time Deliveries Through Demand-Driven MRP and PDCA in a Make-to-Order Environment of Non-primary Manufacturing Industry. In: Ahram, T., Taiar, R. (eds) Human Interaction, Emerging Technologies and Future Systems V. IHIET 2021. Lecture Notes in Networks and Systems, vol 319. Springer, Cham. https://doi.org/10.1007/978-3-030-85540-6_155
Download citation
DOI: https://doi.org/10.1007/978-3-030-85540-6_155
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-85539-0
Online ISBN: 978-3-030-85540-6
eBook Packages: EngineeringEngineering (R0)