Abstract
This paper considers a static resource constrained multi-project scheduling problem (RCMPSP) with two lateness objectives: project lateness and portfolio lateness. To solve the RCMPSP, we have proposed an evolutionary local search heuristic that uses a variable neighborhood (ELSH-VN) approach. The heuristic is further analyzed by incorporating different priority-rules. To judge the performance of these priority rule based heuristics, an extensive simulation-based analysis has been conducted with different scenario-based schedules. For the experimental study, we have considered a standard set of 77 generated RCMPSP test instances of 20 activities. The experimental analysis indicates that the proposed heuristic is able to solve multiple projects with reasonable computational burden. The influence of the variation of resource distribution and resource contention on the algorithm’s performance for different priority rules is also analyzed and discussed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Payne, J.H., Management of multiple simultaneous projects: a state-of-the-art review. International journal of project management, 1995. 13(3): p. 163–168.
Browning, T.R. and A.A. Yassine, Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 2010. 126(2): p. 212–228.
Blazewicz, J., J.K. Lenstra, and A. Kan, Scheduling subject to resource constraints: classification and complexity. Discrete Applied Mathematics, 1983. 5(1): p. 11–24.
Drexl, A., Scheduling of project networks by job assignment. Management Science, 1991. 37(12): p. 1590–1602.
Gonçalves, J.F., J.J. Mendes, and M.G. Resende, A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research, 2008. 189(3): p. 1171–1190.
Mouthuy, S., et al., A Multistage Very Large-Scale Neighborhood Search for the Vehicle Routing Problem with Soft Time Windows. Transportation Science, 2015. 49(2): p. 223–238.
Mladenovic, N., R. Todosijevic, and D. Urosevic, An efficient general variable neighborhood search for large travelling salesman problem with time windows. Yugoslav Journal of Operations Research ISSN: 0354–0243 EISSN: 2334-6043, 2012. 23(1).
Talbot, F.B., Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case. Management Science, 1982. 28(10): p. 1197–1210.
Kolisch, R., Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research, 1996. 90(2): p. 320–333.
Kolisch, R., Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 1996. 14(3): p. 179–192.
Kolisch, R. and S. Hartmann, Experimental investigation of heuristics for resource-constrained project scheduling: An update. European journal of operational research, 2006. 174(1): p. 23–37.
Patterson, J.H., Alternate methods of project scheduling with limited resources. Naval Research Logistics Quarterly, 1973. 20(4): p. 767–784.
Alvarez-Valdes, R. and J.M. Tamarit, Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis, in Advances in project scheduling. 1989, Elsevier Amsterdam. p. 113–134.
Kurtulus, I.S. and S.C. Narula, Multi-project scheduling: Analysis of project performance. IIE transactions, 1985. 17(1): p. 58–66.
Davis, E.W. and J.H. Patterson, A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management science, 1975. 21(8): p. 944–955.
Browning, T.R. and A.A. Yassine, A random generator of resource-constrained multi-project network problems. Journal of scheduling, 2010. 13(2): p. 143–161.
Kurtulus, I. and E. Davis, Multi-project scheduling: Categorization of heuristic rules performance. Management Science, 1982. 28(2): p. 161–172.
Zimmerman, D.W. and B.D. Zumbo, Relative power of the Wilcoxon test, the Friedman test, and repeated-measures ANOVA on ranks. The Journal of Experimental Education, 1993. 62(1): p. 75–86.
Gehan, E.A., A generalized Wilcoxon test for comparing arbitrarily singly-censored samples. Biometrika, 1965. 52(1–2): p. 203-223.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this paper
Cite this paper
Chakrabortty, R.K., Sarker, R.A., Essam, D.L. (2017). Resource Constrained Multi-project Scheduling: A Priority Rule Based Evolutionary Local Search Approach. In: Leu, G., Singh, H., Elsayed, S. (eds) Intelligent and Evolutionary Systems. Proceedings in Adaptation, Learning and Optimization, vol 8. Springer, Cham. https://doi.org/10.1007/978-3-319-49049-6_6
Download citation
DOI: https://doi.org/10.1007/978-3-319-49049-6_6
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-49048-9
Online ISBN: 978-3-319-49049-6
eBook Packages: EngineeringEngineering (R0)