Skip to main content

A Two-Stage Heuristic Procedure for Solving the Long-Term Unit Commitment Problem with Pumped Storages and Its Application to the German Electricity Market

  • Conference paper
  • First Online:
Operations Research Proceedings 2016

Part of the book series: Operations Research Proceedings ((ORP))

Abstract

In electricity systems unit commitment problems (UCP) target at a proper scheduling and coordinating of thermal plants, renewable energies, and storages. The need for fast solution methods has been growing in line with recent changes in the electricity system’s environment and complexity, in particular with the increasing share of volatile renewable feed-ins. In order to meet this need even for large-scale systems a decomposition methodology for the UCP is suggested within this paper. Our two-stage decomposition first performs an isolated dispatching of thermal plants using a greedy algorithm, rule-based algorithms and local search based steps, followed by a re-optimization stage in order to incorporate energy storages into the final solution. The comparison of the iterative two-stage heuristic with commonly used approaches based on mixed integer linear programming shows outstanding results in terms of solution time and solution quality. Besides typically used test instances, the heuristic is applied to comprehensive case studies of the German electricity market, where (near-) optimal solutions can be derived for a yearly planning horizon with hourly time steps with computational effort of a few minutes using a standard PC.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Carrión, M., Arroyo, J.M.: A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem. IEEE Trans. Power Syst. 21, 1371–1378 (2006)

    Article  Google Scholar 

  2. Franz, A., Rieck, J., Zimmermann, J.: Two-stage heuristic approach for solving the long-term unit commitment problem with hydro-thermal coordination. In: Operations Research Proceedings (2015)

    Google Scholar 

  3. Kazarlis, S.A., Bakirtzis, J.M., Petridis, V.: A genetic algorithm solution to the unit commitment problem. IEEE Trans. Power Syst. 11, 83–92 (1996)

    Article  Google Scholar 

  4. Morales-España, G., Latorre, J.M., Ramos, A.: Tight and compact MILP formulation for the thermal unit commitment problem. IEEE Trans. Power Syst. 28, 4897–4908 (2013)

    Article  Google Scholar 

  5. Saravanan, B., Das, S., Sikri, S., Kothari, D.P.: A solution to the unit commitment problem—a review. Front. Energ. 7, 223–236 (2013)

    Article  Google Scholar 

  6. Viana, A., Pinho de Sousa, J., Matos, M.A.: Fast solutions for UC problems by a new metaheuristic approach. Electric Power Syst. Res. 78, 1385–1395 (2008)

    Article  Google Scholar 

  7. Wagner, A.: Residual demand modeling and application to electricity pricing. Energ. J. 35, 45–73 (2014)

    Article  Google Scholar 

  8. Wood, A.J., Wollenberg, B.F., Sheblé, G.B.: Power Generation, Operation, and Control. Wiley, Hoboken (2014)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Alexander Franz .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this paper

Cite this paper

Franz, A., Zimmermann, J. (2018). A Two-Stage Heuristic Procedure for Solving the Long-Term Unit Commitment Problem with Pumped Storages and Its Application to the German Electricity Market. In: Fink, A., Fügenschuh, A., Geiger, M. (eds) Operations Research Proceedings 2016. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-319-55702-1_21

Download citation

Publish with us

Policies and ethics