Causes-Effects Relationship of Construction Project Delays in Ghana: Focusing on Local Government Projects

  • Conference paper
  • First Online:
Advances in Human Factors, Sustainable Urban Planning and Infrastructure (AHFE 2017)

Abstract

Project delays in the construction industry are a worldwide phenomenon and local government construction projects in Ghana are not an exception. The paper presents the results of a survey conducted to identify and assess the severity of the causes of local government construction project delays and their effect in Ghana. In previous research, the causes and the effects of project delays has been studied without considering the possible relationship that exist between them. This study takes a combined approach and also sought to analyze the relationship between specific causes on specific effects. The results of the study revealed the main causes of schedule delays in local government construction projects as: delay in progress payments; variation orders during construction; difficulties in financing projects by contractors; delay in material delivery; and unforeseen site conditions. The study further identified the effects of delay as: time overrun; cost overrun; delay by contractor in repayment of loans; disputes; and poor quality work due to speeding up of work. The study also established an empirical correlation between each cause and effect. The study revealed that bulk of the effects of delay of local government construction projects is triggered by client-related and contractor-related causes.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Aibinu, A.A., Jagboro, G.O.: The effects of construction delays on project delivery in Nigerian construction industry. Int. J. Project Manage. 20, 593–599 (2002)

    Article  Google Scholar 

  2. Assaf, S.A., Al-Hejji, S.: Causes of delay in large construction projects. Int. J. Project Manage. 24(4), 349–357 (2006)

    Article  Google Scholar 

  3. Chan, D.W.M., Kumaraswamy, M.M.: A comparative study of causes of time overruns in Hong Kong construction projects. Int. J. Project Manage. 15(1), 55–63 (1997)

    Article  Google Scholar 

  4. Chileshe, N., Berko, P.D.: Causes of project cost overrun within Ghanaian road construction sector. In: The Proceeding of ASOCSA 5th Built Environment Conference, Durban, South Africa (2010)

    Google Scholar 

  5. Fugar, F.D.K., Agyakwah-Baah, A.B.: Delays in building construction projects in Ghana. Australas. J. Constr. Econ. Build. 10(1), 103–116 (2010). http://epress.lib.uts.edu.au/journals/index.php/AJCEB. Accessed 13 Dec 2014

    Google Scholar 

  6. Ghana National Development Planning Commission: Construction Industry in Ghana. Report (2011)

    Google Scholar 

  7. Ghana Statistical Service: Ghana Domestic Product for 2012 (2012). www.statsghana.gov.g. Accessed 20 Dec 2012

  8. Idrus, A., Sodangi, M., HaqHusin, M.: Prioritizing project performance criteria within client perspective. Res. J. Appl. Sci. Eng. Technol. 3(10), 1142–1151 (2011)

    Google Scholar 

  9. Kikooma, J.F.: Using qualitative data analysis software in a social constructionist study of entrepreneurship. Qual. Res. J. 10(1), 40–51 (2010)

    Article  Google Scholar 

  10. MALBEX: Market watch – construction industry. Kuala Lumpur Exhibition Center Report, pp. 1–8 (2005)

    Google Scholar 

  11. Manavazhia, M.R., Adhikarib, D.K.: Material and equipment procurement delays in highway projects in Nepal. Int. J. Project Manage. 20, 627–632 (2002)

    Article  Google Scholar 

  12. Mansfield, N.R., Ugwu, O.O., Doran, T.: Causes of delay and cost overruns in Nigeria construction projects. Int. J. Project Manage. 12(4), 254–660 (1994)

    Article  Google Scholar 

  13. Ministry of Finance: Government Budget Statement. Accra, Ghana (1999)

    Google Scholar 

  14. Mohd, R.: The factors and effect of delay in government construction. B.Sc. thesis, University Malaysia Pahang (2010). http://elib.uum.edu. Accessed 20 Feb 2014

  15. Mulcahy and Partners: Project Management in Construction’s role in accommodating future population growth (2014). www.mmp.ie/project-management-in-constructions-role-in-accommodation. Accessed 4 Nov 2013

  16. Nwachuku, C.C., Emoh, F.I.: A system approach in analyzing material constraining factors to factors to construction project management success in Nigeria. IJCRB 2(5), 90–104 (2011)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Simon Ofori Ametepey .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this paper

Cite this paper

Ametepey, S.O., Gyadu-Asiedu, W., Assah-Kissiedu, M. (2018). Causes-Effects Relationship of Construction Project Delays in Ghana: Focusing on Local Government Projects. In: Charytonowicz, J. (eds) Advances in Human Factors, Sustainable Urban Planning and Infrastructure. AHFE 2017. Advances in Intelligent Systems and Computing, vol 600. Springer, Cham. https://doi.org/10.1007/978-3-319-60450-3_9

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-60450-3_9

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-60449-7

  • Online ISBN: 978-3-319-60450-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics