Skip to main content

Assessing the Investments Sustainability After the New Code on Public Contracts

  • Conference paper
  • First Online:
Computational Science and Its Applications – ICCSA 2017 (ICCSA 2017)

Abstract

The new Code on Contracts regulations reaffirmed the central role of assessment in procedures for public works construction. However, it has significantly distorted the sense of the previous rules where the preliminary investment assessment was essential and was implemented through the feasibility study. What happened, then, to the feasibility studies? Maybe the intentions of Legislative Decree no. 50/2016 were mixed, but the preliminary project and the feasibility study was erased, now at least formally. Why has the legislature felt the need to eliminate such an important study? So far was the feasibility study to identify the most proper management aspects, not the preliminary project, not the final draft or the executive project. The Italian tradition has unfortunately too often led to the creation of works with no real requirement to be satisfied without worrying about the sustainability of the operating costs. The only thought is on allocated resources available for construction. This has generated works partially unused, slightly used, and/or often obsolescent because the contracting authorities try to confirm that the asset portion is actually used while decreasing resources. This paper focuses on multi-annual programming, which has seen the most relevant changes while investigating the economic and procedural implications consequential to the new Code.

This paper is to be attributed in equal parts to the authors.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Prizzon, F., Rebaudengo, M.: Public investments evaluation: what lies ahead? click day vs. selection. LaborEst n. 10 (2015). ISSN 1973-7688. ISBN 978-88-72-21-380-3. ISSN 2421-3187 (online)

    Google Scholar 

  2. Ordinary Supplement to GURI no. 100 of 2 May 2006

    Google Scholar 

  3. Ordinary Supplement to GURI no. 288 of 10 December 2010

    Google Scholar 

  4. Ordinary Supplement to GURI no. 10 of 19 April 2016

    Google Scholar 

  5. Ordinary Supplement to GURI no. 41 of 19 February 1994

    Google Scholar 

  6. Ordinary Supplement to GURI no. 148 of 27 June 2000

    Google Scholar 

  7. http://www.regioni.it/fascicoli_conferen/Presidenti/2001/20010308/08012001_studi_fat.htm

  8. Ordinary Supplement to GURI no. 227 of 2 October 2008

    Google Scholar 

  9. http://www.anticorruzione.it/portal/public/classic/AttivitaAutorita/AttiDellAutorita/_Atto?ca=3665

  10. Regional Executive Order (DGR) 28 March 2012

    Google Scholar 

  11. http://www.itaca.org/documenti/news/LG%20ITACA%20SDF_Completo_240113.pdf

  12. Prizzon, F., Rebaudengo, M., Taccone, G., Talarico, A.: La programmazione di opere pubbliche in piemonte: il caso dei programmi integrati di sviluppo locale (P.I.S.L.). Paper in Atti della XXVII Conferenza Italiana Di Scienze Regionali (AISRe), Pisa (2006). ISBN 88-87788-07-3

    Google Scholar 

  13. Rebaudengo, M.: I P.I.S.L. della Regione Piemonte: Proposta di classificazione tematica attraverso l’analisi del discriminante. Paper in atti della XXVIII Conferenza Italiana Di Scienze Regionali (AISRe), Bolzano (2007). ISBN 88-87788-08-1

    Google Scholar 

  14. Prizzon, F., Rebaudengo, M., Taccone, G., Talarico, A.: Il ruolo degli studi di fattibilità per la selezione dei programmi integrati: il caso dei P.I.S.L. della regione piemonte. Paper in atti della XXVIII Conferenza Italiana Di Scienze Regionali (AISRe), Bolzano (2007). ISBN 88-87788-08-1

    Google Scholar 

  15. Rebaudengo, M., Taccone, G.: Esperienze di programmazione regionale a confronto: PISL e PTI della regione piemonte. Paper in atti della XXX Conferenza Italiana Di Scienze Regionali (AISRe), Firenze (2009)

    Google Scholar 

  16. Haroun, A.E.: Maintenance cost estimation: application of activity-based costing as a fair estimate method. J. Q. Maint. Eng. 21(3), 258–270 (2015). doi:10.1108/JQME-04-2015-0015

    Article  MathSciNet  Google Scholar 

  17. Higgins, L.R., Mobley, R.K., Wikoff, D.: Estimating repair and maintenance costs. In: Maintenance Engineering Handbook, 7 edn. McGraw-Hill Professional (2008, 2002, 1995, 1988, 1977, 1966, 1957). AccessEngineering

    Google Scholar 

  18. Prizzon F., Rebaudengo M.: Unfinished public works: a national heritage to develop? LaborEst n.11 (2015). ISSN 1973-7688. ISBN 978-88-72-21-380-3. ISSN 2421-3187 (online)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Manuela Rebaudengo .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer International Publishing AG

About this paper

Cite this paper

Rebaudengo, M., Prizzon, F. (2017). Assessing the Investments Sustainability After the New Code on Public Contracts. In: Gervasi, O., et al. Computational Science and Its Applications – ICCSA 2017. ICCSA 2017. Lecture Notes in Computer Science(), vol 10409. Springer, Cham. https://doi.org/10.1007/978-3-319-62407-5_33

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-62407-5_33

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-62406-8

  • Online ISBN: 978-3-319-62407-5

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics