Summary
This chapter describes how the Resource-Constrained Project Scheduling Problem (RCPSP) can be used as a basis for comprehensive disruption management, concerned with both rescheduling as well as potential process variations. It is illustrated how the RCPSP can be extended by the possibility to represent alternative activities and how the respective constructs can be used to describe various forms of typical interventions. Moreover, an approach for schedule optimization and the resolution of the generalized problem is presented, based on the combination of well-established methodologies and specific evolutionary operators. In an illustrative example it is finally shown how the proposed framework can be applied for the development of real-time decision support systems in the domain of airport ground process management.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
G. Yu, X. Qi, Disruption Management: Framework, Models and Applications, World Scientific Publishing, Singapore, 2004
J. Clausen, J. Hansen, J. Larsen, A. Larsen, Disruption Management, ORMS Today, 28: 40–43, 2001
G. Zhu, J.F. Bard, G. Yu, Disruption Management for Resource-Constrained Project Scheduling, Journal of the Operational Research Society, 56: 365–381, 2005
K.S. Hindi, H. Yang, K. Fleszar, An Evolutionary Algorithm for Resource-Constrained Project Scheduling, IEEE Transactions on Evolutionary Computation, 6: 512–518, 2002
S. Hartmann, Project Scheduling with Multiple Modes: A Genetic Algorithm, Annals of Operations Research, 102: 111–135, 2001
C. Artigues, P. Michelon, S. Reusser, Insertion Techniques for Static and Dynamic Resource Constrained Project Scheduling, European Journal of Operational Research, 149: 249–267, 2003
A. Elkhyari, C. Gueret, N. Jussien, Constraint Programming for Dynamic Scheduling Problems, ISS’04, Japan, 84–89, 2004
J.C. Beck, M.S. Fox, Constraint Directed Techniques for Scheduling with Alternative Activities, Artificial Intelligence, 121: 211–250, 2000
R. Kolisch, S. Hartmann, Heuristic Algorithms for Solving the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis, Project scheduling: Recent models, algorithms and applications, 147–178, Ed: J. Weglarz, Kluwer, Amsterdam, Netherlands, 1999
R.K.-Y. Li, R.J. Willis, Alternative Resources in Project Scheduling, Computers and Operations Research, 18: 663–669, 1991
J. Bautista, A. Lusa, R. Suarez, M. Mateo, R. Pastor, A. Corominas, Application of Genetic Algorithms to Assembly Sequence Planning with Limited Resources, IEEE International Symposium on Assembly and Task Planning, Porto, Portugal, 411–416, 1999
J. Yang, X. Qi, G. Yu, Disruption Management in Production Planning, Naval Research Logistics, 52: 420–442, 2005
Y. Xia, M.H. Yang, B. Golany, S. Gilbert, G. Yu, Real-Time Disruption Management in a Two-Stage Production and Inventory System, IIE Transactions, 36: 111–125, 2004
M. Xu, X. Qi, G. Yu, H. Zhang, C. Gao, The Demand Disruption Management Problem for a Supply Chain System with Nonlinear Demand Functions, JSSSE, 12: 82–97, 2003
B. Thengvall, J.F. Bard, G. Yu, Balancing User Preferences for Aircraft Schedule Recovery During Irregular Operations, IIE Transactions on Operations Engineering, 32: 181–193, 2000
N. Kohl, A. Larsen, J. Larsen, A. Ross, S. Tiourine, Airline Disruption Management – Perspectives, Experiences and Outlook, Technical Report, IMM, Technical University of Denmark, 2004
J. Clausen, A. Larsen, J. Larsen, Disruption Management in the Airline Industry – Concepts, Models and Methods, Technical Report 2005-01, IMM, Technical University of Denmark, 2005
F.R. Carr, Robust Decision Support Tools for Airport Surface Traffic, PhD Thesis, Massachusetts Institute of Technology, 2004
J. Kuster, D. Jannach, G. Friedrich, Handling Alternative Activities in Resource-Constrained Project Scheduling Problems, IJCAI 2007 – Proceedings of the Twentieth International Joint Conference on Artificial Intelligence, 1960–1965, 2007
J. Kuster, D. Jannach, G. Friedrich, Local Rescheduling – A Novel Approach for Efficient Response to Schedule Disruptions, IEEE Symposium on Computational Intelligence in Scheduling, 79–86, 2007
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2008 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Kuster, J., Jannach, D. (2008). Extending the Resource-Constrained Project Scheduling Problem for Disruption Management. In: Chountas, P., Petrounias, I., Kacprzyk, J. (eds) Intelligent Techniques and Tools for Novel System Architectures. Studies in Computational Intelligence, vol 109. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-77623-9_3
Download citation
DOI: https://doi.org/10.1007/978-3-540-77623-9_3
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-77621-5
Online ISBN: 978-3-540-77623-9
eBook Packages: EngineeringEngineering (R0)