Abstract
Based on the reference to domestic and foreign correlative theories and methods, cost-significant theory and neural network theory are used to estimate project cost in the paper. The cost-significant theory is put forward to solve the tedious operation issues by finding out significant items to simplify the operational difficulty of engineering cost estimation. Then the BP neural network is applied to distill the data of CSIs and csf from the completed projects. It has realized the accurate prediction of project investment by using the two nonlinear theories. The basic theories of CS and BP neural network are illustrated by an example From the example, it shows that the relative errors are so small that they can meet the accurate demands of cost estimation. Meanwhile, the test results show that the model based on cost- significant theory and neural network theory is successful and effective for practical engineering.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Malcolm, R., Horner, W.: New Property of Numers-The Mean Value and its Application to Data Simplification. The Papers to the Royal Society, London (2004)
Zakieh, R.: Quantity-significance and Its Application to Construction Project Modelling. University of Dundee, Dundee (1991)
AI-Hubail, J.: Modelling Operation and Maintenance Expenditures in the Offshore Oil and Gas Industry. Department of Civil Engineering of The University of Dundee, Dundee (2000)
Asif, M.: Simple Generic Models for Cost-Significant Estimating of Construction Project Cost. Department of Civil Engineering of The University of Dundee, Dundee (1988)
Duan, X.C., Zhang, J.W.: The Government Investment Project Overall Investment Control Theory and Study Method. Science press, Beijing (2007)
Wang, N.: New Approaches to Optimising the Whole Life Performance of Building and Civil Engineering Projects, Department of Civil Engineering of the University of Dundee, Dundee (2005)
Shao, F.J., Yu, Z.Q.: Principle and method of Data mining. China HydropowerPress, Beijing (2003)
Wang, W.: Artificial Neural Network Theory-Application and Introductory. Beijing Aeronautics and Astronautics University Press, Beijing (1996)
Jiao, L.C.: Neural Network Theory. Xi’an Electronic Technology University Press, Xi’an (1994)
Cheng, M.: Neural Network Model. Dalian University of Science and Technology Press, Dalian (1995)
Yan, P.F., Zhang, C.S.: Artificial Neural Network and Simulation Calculation. Tsinghua University Press, Beijing (2000)
Zhou, L.P., Hu, Z.F.: The Application of Neural Network in the Cost Estimation of Construction. Journal of Xi’an University of Architecture& Technology 37(2), 261–264 (2005)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Wang, X., Xing, L., Lin, F. (2009). The Study of Project Cost Estimation Based on Cost-Significant Theory and Neural Network Theory. In: Wang, H., Shen, Y., Huang, T., Zeng, Z. (eds) The Sixth International Symposium on Neural Networks (ISNN 2009). Advances in Intelligent and Soft Computing, vol 56. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-01216-7_4
Download citation
DOI: https://doi.org/10.1007/978-3-642-01216-7_4
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-01215-0
Online ISBN: 978-3-642-01216-7
eBook Packages: EngineeringEngineering (R0)