Abstract
Aiming at the defects of simply using LEC method to evaluate the risk factors in working system, this paper thoroughly analyses the main factors which can influence the hazard assessment; adapts LEC and AHP assessment methods with the combination of the former accident cases and experts’ experiences; associates multiple factors that can lead to accidents, assigns reasonable weights, thus determines the importance order of the factors. The statistical data verifies that the above method implements the quantitative assessment objectively, which can guarantee the consistency of the evaluation result and statistical data.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Lv, A., Wang, P., Feng, L.: Identification, Appraisal and Control of Hazard Installations in Construction Engineering. Journal of Huazhong University of Science and Technology 1, 43–45 (2006)
Liu, Zhang, X., Liu, G.: The Application Guide of Safety Assessment method. Chemical Industry Press, Safety Science and Engineering Publishing Center (2005)
Wang, L., Xu, S.: AHP Introduction. China Renmin University Press (1990)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Zhou, Jl., Tang, Dw., Liu, Xr., Gong, Sy. (2009). A LEC-and-AHP Based Hazard Assessment Method in Hydroelectric Project Construction. In: Wang, H., Shen, Y., Huang, T., Zeng, Z. (eds) The Sixth International Symposium on Neural Networks (ISNN 2009). Advances in Intelligent and Soft Computing, vol 56. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-01216-7_9
Download citation
DOI: https://doi.org/10.1007/978-3-642-01216-7_9
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-01215-0
Online ISBN: 978-3-642-01216-7
eBook Packages: EngineeringEngineering (R0)