Abstract
The shield machine cutterhead load domain in composite strata is an important and complex problem, which has significant impact on the design of the cutterhead. In this paper, the load model of the cutterhead including resistance and resistance moment is developed through the micro-unit method under composite strata, and responses of cutterheads with different open ratios are analyzed by numerical simulations with the developed load model.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Yin, L.C., Zhu, Z.H., Li, Y.Z., et al.: Japanese New Technology in Tunnel Shielding (in Chinese). Huazhong University of Science and Technology Press, Wuhan (1999)
Zhao, J., Gong, Q.M., Eisensten, Z.: Tunnelling through a frequently changing and mixed ground: A case history in Singapore. Tunnelling and Underground Space Technology 22(4), 388–400 (2007)
Zhu, W.B., Ju, S.J., Shi, H.O.: Guangzhou Metro Line 3 Shield Tunnelling Construction Technology (in Chinese). Jinan University Press, Guangzhou (2007)
Zeng, H.B.: Study on Application Technology of Earth Pressure Balance Shield Tunnelling in Complex Strata (in Chinese). Ms D Thesis. Hohai University, Nanjing (2006)
Xu, S.H., Zhu, W.B., Yuan, M.Z.: Exploration and Breakthrough of Mix Ground Shield Technology in Guangzhou Metro (in Chinese). In: Proceedings of 2005 Shanghai International Forum on Tunnelling, pp. 189–197. Tongji University Press, Shanghai (2005)
Zhang, F.X., Zhu, H.H., Fu, D.M.: Shield Tunnelling Method (in Chinese). China Communications Press, Beijing (2004)
Reilly, B.J.: EPBMs for the North East line project. Tunnelling and Underground Space Technology 14(4), 491–508 (1999)
Hu, X.P.: Study on Abrasion of Cutters during EPB Shield Tunneling in Sandy Cobble Stratum (in Chinese). Ms D Thesis. Beijing Jiaotong University, Beijing (2006)
Lu, Q., Wang, H.L., Fu, D.M.: Research on Torque of Cutterhead for Earth Pressure Balance Shield Machine (in Chinese). In: Proceedings of 2005 Shanghai International Forum on Tunnelling, pp. 452–460. Tongji University Press, Shanghai (2005)
Lu, Q., Fu, D.M.: Research on Torque of Cutterhead for Earth Pressure Balance Shield with Simulating Experimental (in Chinese). Chinese Journal of Rock Mechanics and Engineering 25(S1), 3137–3143 (2006)
Guan, H.S.: Study on the Calculating Models of Key Parameters & Mechanical Behavior of the EPB Shield Machine (in Chinese). PhD Thesis. Southwest Jiaotong University, Chengdu (2007)
Zhu, H.H., Xu, Q.W., Liao, S.M., et al.: Experimental Study on Thrust Force during Tunnel Excavation with Earth Pressure Balance Shield Machine (in Chinese). Rock and soil Mechanics 28(8), 587–1594 (2007)
Zhan, S.X., Kang, C.G., Cao, L.J., et al.: Computation of Earth Pressure on Working Face and Optimization of Cylinder Thrust Force for EPB Shield Machine (in Chinese). Science Technology and Engineering 8(23), 6278–6282 (2008)
Song, K.Z.: Calculation on Thrust and Cutter Disc Torque of Shield in Sandy Cobble with No Water (in Chinese). Construction Machinery 10, 58–60, 63 (2004)
Cui, G.H., Wang, G.Q., Wang, J.X., et al.: Cutting Dynamic Model for Cutters of Shield Machine under Soft Soil (in Chinese). Journal of Jilin University (Engineering and Technology Edition) 38(S2), 139–143 (2008)
Song, K.Z., Pan, A.G.: Operation Principle Analysis of Cutting Tools on Shield (in Chinese). Construction Machinery 3, 74–76 (2007)
Chen, X.Z.: Soil Mechanics and Geotechnical Engineering (in Chinese). Tsinghua University Press, Beijing (2004)
Song, K.Z., Li, C.M., Yuan, D.J., et al.: Study on Distribution Regularities of Disc Cutter Thrust Force for Shield Tunneling (in Chinese). Chinese Journal of Rock Mechanics and Engineering 27(S2), 3875–3881 (2008)
Zhang, Z.H., Ye, D.H., Mao, C.J.: Full Face Rock Tunneling Machine Tools and Force Analysis– the Second Technical lecture Full Face Rock Tunneling Machine (in Chinese). Construction Machinery 10, 28–32 (1998)
Sugimoto, M., Sramoon, A.: Theoretical Model of Shield Behavior During Excavation. I: Theory. Journal of Geotechnical and Geoenvironmental Engineering 128(2), 138–155 (2002)
Yang, H.J., Fu, D.M., Ge, X.R.: Experimental Study and Numerical Simulation of Earth Pressure around Shield Machine (in Chinese). Chinese Journal of Rock Mechanics and Engineering 25(8), 1652–1657 (2006)
Wang, H.X., Fu, D.M., Li, X.H.: Statistical Analysis of EPB Shield Main Parameters (in Chinese). In: Proceedings of 2005 Shanghai International Forum on Tunnelling, pp. 248–255. Tongji University Press, Shanghai (2005)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Wen, W., Feng, P., Wu, Z., Liu, J. (2009). Study on External Load Domain of Shield Machine Cutterhead. In: Xie, M., Xiong, Y., Xiong, C., Liu, H., Hu, Z. (eds) Intelligent Robotics and Applications. ICIRA 2009. Lecture Notes in Computer Science(), vol 5928. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-10817-4_115
Download citation
DOI: https://doi.org/10.1007/978-3-642-10817-4_115
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-10816-7
Online ISBN: 978-3-642-10817-4
eBook Packages: Computer ScienceComputer Science (R0)