Skip to main content

Mobile Workforce Scheduling Problem with Multitask-Processes

  • Conference paper
Book cover Business Process Management Workshops (BPM 2009)

Part of the book series: Lecture Notes in Business Information Processing ((LNBIP,volume 43))

Included in the following conference series:

Abstract

In this work we introduce a new generalization of the Resource-Constrained Project Scheduling Problem – the Mobile Workforce Scheduling Problem with Multitask-Processes (MWSP-MP). This scheduling problem arises in mobile work scenarios and is characterized by tasks to be scheduled that are not independent from each other, but belong to structured business processes. These business processes are subject to timing and cost related properties and restrictions that have to be considered for the scheduling of resources. We fortify the relevance of the MWSP-MP by illustration with process examples from the utility industry and present an initial heuristic for the insertion of processes into solutions of the problem.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Gruhn, V., Köhler, A., Klawes, R.: Modeling and analysis of mobile business processes. Journal of Enterprise Information Management 20(6), 657 (2007)

    Article  Google Scholar 

  2. Luff, P., Heath, C.: Mobility in collaboration. In: Proceedings of the 1998 ACM Conference on Computer supported cooperative work, pp. 305–314. ACM Press, New York (1998)

    Chapter  Google Scholar 

  3. Kolisch, R.: Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research 90(2), 320–333 (1996)

    Article  Google Scholar 

  4. Brucker, P., Drexl, A., Möhring, R., Neumann, K., Pesch, E.: Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research 112(1), 3–41 (1999)

    Article  Google Scholar 

  5. Laporte, G., Semet, F.: Classical heuristics for the capacitated vrp. In: Toth, P., Vigo, D. (eds.) The Vehicle Routing Problem. SIAM Monographs on Discrete Mathematics and Applications, Philadelphia, pp. 109–128 (2002)

    Google Scholar 

  6. Cordeau, F.J., Desaulniers, G., Desrosiers, J., Solomon, M., Soumis, F.: Vrp with time windows. In: Toth, P., Vigo, D. (eds.) The Vehicle Routing Problem. SIAM Monographs on Discrete Mathematics and Applications, Philadelphia, pp. 157–193 (2002)

    Google Scholar 

  7. Baldacci, R., Battarra, M., Vigo, D.: Routing a heterogeneous fleet of vehicles. In: The Vehicle Routing Problem: Latest Advances and New Challenges. Operations Research/Computer Science Interfaces Series, vol. 43, pp. 3–27. Springer, Heidelberg (2008)

    Chapter  Google Scholar 

  8. Parragh, S., Doerner, K., Hartl, R.: A survey on pickup and delivery problems - part i: Transportation between customers and depot. Journal für Betriebswirtschaft 58(1), 21–51 (2008)

    Article  Google Scholar 

  9. Parragh, S., Doerner, K., Hartl, R.: A survey on pickup and delivery problems - part ii: Transportation between pickup and delivery locations. Journal für Betriebswirtschaft 58(2), 81–117 (2008)

    Article  Google Scholar 

  10. Savelsbergh, W.P.M., Sol, M.: The general pickup and delivery problem. Transportation Science 29(1), 17–30 (1995)

    Article  Google Scholar 

  11. Goel, A., Gruhn, V.: A general vehicle routing problem. European Journal of Operational Research 191(3), 650–660 (2008)

    Article  Google Scholar 

  12. Sprecher, A., Drexl, A.: Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. European Journal of Operational Research 107(2), 431–450 (1998)

    Article  Google Scholar 

  13. Ursu, F.M.: Distributed resource allocation via local choices: A case study of workforce allocation. International Journal of Knowledge-Based and Intelligent Engineering Systems 9(4), 293–301 (2005)

    Article  Google Scholar 

  14. Russell, N., van der Aalst, M.P.W., ter Hofstede, H.M.A., Edmond, D.: Workflow resource patterns. In: Pastor, Ó., Falcão e Cunha, J. (eds.) CAiSE 2005. LNCS, vol. 3520, pp. 216–232. Springer, Heidelberg (2005)

    Google Scholar 

  15. Zur Muehlen, M.: Organizational management in workflow applications - issues and perspectives. Information Technology and Management 5(3), 271–291 (2004)

    Article  Google Scholar 

  16. Netjes, M., van der Aalst, M.P.W., Reijers, A.H.: Analysis of resource-constrained processes with colored petri nets. In: Sixth Workshop and Tutorial on Practical Use of Coloured Petri Nets and the CPN Tools (2005)

    Google Scholar 

  17. Jensen, K.: Coloured Petri nets: basic concepts, analysis methods and practical use, 2nd edn., vol. 1. Springer-Verlag, London, UK (1996)

    Book  Google Scholar 

  18. Pesic, M., van der Aalst, M.P.W.: Modelling work distribution mechanisms using colored petri nets. International Journal on Software Tools for Technology Transfer (STTT) 9(3), 327–352 (2007)

    Article  Google Scholar 

  19. Pesic, M., van der Aalst, M.P.W.: Towards a reference model for work distribution in workflow management systems. Business Process Reference Models

    Google Scholar 

  20. Voudouris, C., Owusu, K.G., Dorne, J.H.R., Ladde, C., Virginas, B.: Arms: An automated resource management system for british telecommunications plc. European Journal of Operational Research 171(3), 951–961 (2006)

    Article  Google Scholar 

  21. Cowling, P., Colledge, N., Dahal, K., Remde, S.: The trade off between diversity and quality for multi-objective workforce scheduling. In: Gottlieb, J., Raidl, G.R. (eds.) EvoCOP 2006. LNCS, vol. 3906, pp. 13–24. Springer, Heidelberg (2006)

    Chapter  Google Scholar 

  22. Shaw, P.: A new local search algorithm providing high quality solutions to vehicle routing problems. APES Group, Dept. of Computer Science, University of Strathclyde, Glasgow, Scotland, UK (1997)

    Google Scholar 

  23. Gruhn, V., Richter, T.: A general model of mobile environments: Simulation support for strategic management decisions. In: Proceedings of the 2nd International Workshop on Personalization in Grid and Service Computing, PGSC 2008 (2008)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Goel, A., Gruhn, V., Richter, T. (2010). Mobile Workforce Scheduling Problem with Multitask-Processes. In: Rinderle-Ma, S., Sadiq, S., Leymann, F. (eds) Business Process Management Workshops. BPM 2009. Lecture Notes in Business Information Processing, vol 43. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-12186-9_9

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-12186-9_9

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-12185-2

  • Online ISBN: 978-3-642-12186-9

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics