Estimating trenching costs in FTTx network planning

  • Conference paper
  • First Online:
Operations Research Proceedings 2011

Part of the book series: Operations Research Proceedings ((ORP))

Abstract

In this paper we assess to which extent trenching costs of an FTTx network are unavoidable, even if technical side constraints are neglected. For that purpose we present an extended Steiner tree model. Using a variety of realistic problem instances we demonstrate that the total trenching cost can only be reduced by about 5 percent in realistic scenarios. This work has been funded by BMBF (German Federal Ministry of Education and Research) within the program “KMU-innovativ”.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. OpenStreetMap project. www.openstreetmap.org.

  2. BMBF project FTTX-PLAN, 2009–2011. www.fttx-plan.de.

  3. M.O. Ball, T.L. Magnanti, C.L. Monma, and G.L. Nemhauser, editors. Network models, volume 7 of Handbooks inOperations Research and Management Science. Elsevier, Amsterdam, 1995.

    Google Scholar 

  4. S. Gollowitzer and I. Ljubić. MIP models for connected facility location: A theoretical and computational study. Computers & Operations Research, 38(2):435–449, 2011.

    Article  Google Scholar 

  5. T. Koch and A. Martin. Solving Steiner tree problems in graphs to optimality. Networks, 32(3):207–232, 1998.

    Article  Google Scholar 

  6. M. Leitner and G.R. Raidl. Branch-and-cut-and-price for capacitated connected facility location. Journal of Mathematical Modelling and Algorithms, 2011. online first, http://dx.doi.org/10.1007/s10852-011-9153-5.

  7. N. Maculan. The Steiner problem in graphs. Ann. Discrete Math., 31:185–211, 1987.

    Google Scholar 

  8. M. Martens, S. Orlowski, A. Werner, R. Wessäly, and W. Bentz. FTTx-PLAN: Optimierter Aufbau von FTTx-Netzen. In Breitbandversorgung in Deutschland, volume 220 of ITGFachbericht. VDE-Verlag, März 2010.

    Google Scholar 

  9. S. Orlowski, A.Werner, R.Wessäly, K. Eckel, J. Seibel, E. Patzak, H. Louchet, andW. Bentz. Schätze heben bei der Planung von FTTx-Netzen: optimierteNutzung von existierenden Leerrohren – eine Praxisstudie. In Breitbandversorgung in Deutschland, ITG-Fachbericht. VDEVerlag, März 2011.

    Google Scholar 

  10. T. Polzin and S.V. Daneshmand. A comparison of Steiner tree relaxations. Discrete Appl. Math., 112(1-3):241–261, 2001.

    Article  Google Scholar 

  11. P. Rigby, editor. FTTH Handbook. FTTH Council Europe, 4th edition, 2011.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sebastian Orlowski .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Orlowski, S., Werner, A., Wessäly, R. (2012). Estimating trenching costs in FTTx network planning. In: Klatte, D., Lüthi, HJ., Schmedders, K. (eds) Operations Research Proceedings 2011. Operations Research Proceedings. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-29210-1_15

Download citation

Publish with us

Policies and ethics