Abstract
Today, value creation within the manufacturing industry is realised in supply networks. A supply network is considered as a collaboration of suppliers and a manufacture (Original Equipment Manufacturer-OEM) to reach a common objective. Firms can now decide which parts of the supply network they will manage directly and which they will be out-source activities. One of the supply network’s features is outsourcing, and it makes a new source of uncertainty. This uncertainty has an impact on supply network performance. Nowadays, researchers have recognised the importance of analysing the delivery time uncertainty in supply networks. Delivery time uncertainty in the OEM, results from the accumulation of individual uncertainties of the suppliers in the network. The supply networks consist of the combination of basic types of network such as linear, star, tree, etc. The types of network have an essential impact on the accumulation of the individual uncertainties. In this paper, a method to calculate the accumulation of the individual uncertainties based on the network type is presented. Finally, an example is given to show the application of this method to the all types of supply network with four nodes.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Notes
- 1.
Probability Density Function.
References
Barker J (2004) ‘Using dynamic information in the supply network. In: Proceedings of the 8th international conference on manufacturing & management: operations management & advanced technology: integration for Success, Australia, pp 1–10
Christopher M (2000) The agile supply chain: competing in volatile markets. Ind Mark Manage 29(1):37–44
Guiffrida AL, Jaber MY (2008) Managerial and economic impacts of reducing delivery variance in the supply chain. Appl Math Model 32:2149–2161
JCGM Member Organizations (2008) ‘Evaluation of measurement data—Guide to the expression of uncertainty in measurement (GUM)-GUM 1995 with minor corrections’, JCGM
Lerder PJ (1997) Pricing, production, scheduling, and delivery-time competition. Int J Oper Res 45(3):407–420
Pathak SD, Dilts DD, Biswas G (2007) On the evolutionary dynamics of supply network topologies. IEEE Trans Eng Manage 54(4):662–672
Safaei M, Seifert M, Thoben KD (2010) Proposed a method for increasing the delivery performance in dynamic supply network. World Acad Sci Eng Technol 70:620–623
Safaei M, Seifert M, Thoben KD (2011) Toward a better understanding of the network type impact on delivery time uncertainty in supply networks’, MITIP 2011. In: Proceedings of the 13th international conference on modern information technology in the innovation processes of industrial enterprises, pp 1–11
Thoben KD, Jagdev H (2001) Typological issues in enterprise networks. J Prod Plan Control 12(5):421–436
Urban TL (2009) Establishing delivery guarantee policies. Eur J Oper Res 196:959–967
Vanany I, Zailani S, Pujawan N (2009) Supply chain risk management: literature review and future research. Int J Inf Syst Supply Chain Manage 2(1):16–33
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Safaei, M., Issa, S., Seifert, M., Thoben, KD., Lang, W. (2013). A Method to Estimate the Accumulated Delivery Time Uncertainty in Supply Networks. In: Kreowski, HJ., Scholz-Reiter, B., Thoben, KD. (eds) Dynamics in Logistics. Lecture Notes in Logistics. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-35966-8_28
Download citation
DOI: https://doi.org/10.1007/978-3-642-35966-8_28
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-35965-1
Online ISBN: 978-3-642-35966-8
eBook Packages: EngineeringEngineering (R0)