Skip to main content

Determination of Economic Production Quantity for a Multi-Stage Production System with Limited Storage Capacity

  • Conference paper
Operations Research Proceedings 2002

Part of the book series: Operations Research Proceedings 2002 ((ORP,volume 2002))

  • 452 Accesses

Abstract

This paper describes a model for a multi-stage production system in which a uniform lot size is produced through all stages with a single setup and without interruption at each stage. Transportation of partial lots, called batches, is allowed between stages before the whole lot is completed. Although the batch size must be equal at any particular stage, the optimal number of equal-sized batches may differ across stages. Additionally, we assume that inventories between consecutive stages are constrained by a limited storage capacity. Considering setup costs, inventory holding costs, and transportation costs, an optimisation method is developed to determine the economic production quantity and the optimal batch sizes for each stage.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Bogaschewsky R, Buscher U and Lindner G (2001) Optimizing Multi-Stage Production with Constant Lot Size and Varying Number of Unequal Sized Batches. Omega 29:183–191

    Article  Google Scholar 

  2. Buscher U and Lindner G (2002) Simultane Bestimmung von Fertigungs-und Transportlosgrößen bei beschränkter Lagerkapazität–Planung stufenbezogener Transporthäufigkeiten. Working Paper, Bayerische Julius-Maximilians University Würzburg, Germany

    Google Scholar 

  3. Drezner Z, Szendrovits AZ and Wesolowsky GO (1984) Multi-Stage Production with Variable Lot Sizes and Transportation of Partial Lots. European Journal of Operational Research 17:227–237

    Article  Google Scholar 

  4. Szendrovits AZ (1975) Manufacturing Cycle Time Determination for a MultiStage Economic Production Quantity Model. Management Science 22: 298–308

    Article  Google Scholar 

  5. Szendrovits AZ and Drezner Z (1980) Optimizing Multi-Stage Production with Constant Lot Size and Varying Number of Batches. Omega 8:623–629

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2003 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Buscher, U., Lindner, G. (2003). Determination of Economic Production Quantity for a Multi-Stage Production System with Limited Storage Capacity. In: Leopold-Wildburger, U., Rendl, F., Wäscher, G. (eds) Operations Research Proceedings 2002. Operations Research Proceedings 2002, vol 2002. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-55537-4_14

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-55537-4_14

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-00387-8

  • Online ISBN: 978-3-642-55537-4

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics