Abstract
The life cycle of an urban railway system is about thirty years, and therefore, any small improvement in operation, results huge savings. The daily operation follows a headway distribution, which itself computed based on the traffic volume. Passing the block sections and stopping in stations are always contaminated with disruptions. The disruptions affect the traffic especially when the headway is in minimum. In this paper, computing the exact practical travel and dwell times is studied. At the first stage a formula is proposed to compute the remained disruptions at the end of the last period in minimum headway. It is supposed that the travel and dwell times take values according to a symmetric distribution. The amount of supplementary times to reach the desired reliability is defined based on the probability of non-absorbed disruptions at the end of the last period. It is concluded that as the number of disrupted travel and dwell times increases the amount of required supplementary times to reach the same level of reliability, increases but in a descending rate. This finding improves the current method to reach the reliability in urban railway operation plans. Finally, the Karaj Metro Line 2 is studied and analyzed as the case study.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Shafia, M.A., Pourseyed Aghaee, M., Sadjadi, S.J., Jamili, A.: Robust train timetabling problem: mathematical model and branch and bound algorithm. IEEE Trans. Intell. Transp. Syst. 13(1), 307–317 (2012)
Bertsimas, D., Sim, M.: The price of robustness. Oper. Res. 52(1), 35–53 (2004)
Khan, M.B., Zhou, X.: Stochastic optimization model and solution algorithm for robust double-track train timetabling problem. IEEE Trans. Intell. Transp. Syst. 11(1), 81–89 (2010)
Liebchen, C., Chachtebeck, M., Schoebel, A., Stiller, S., Prigge, A.: Computing delay resistant railway timetables. Comput. Oper. Res. 37(5), 857–868 (2010)
Carey, M.: Ex ante heuristic measures of schedule reliability. Transp. Res. Part B 33, 473–494 (1999)
Vansteenwegen, P., Oudheusden, D.V.: Developing railway timetables which guarantee a better service. Eur. J. Oper. Res. 173, 337–350 (2006)
Fischetti, M., Monaci, M.: Light robustness. In: Ahuja, R.K., Möhring, R.H., Zaroliagis, C.D. (eds.) Robust and Online Large-Scale Optimization. LNCS, vol. 5868, pp. 61–84. Springer, Heidelberg (2009)
D’Angelo, G., Di Stefano, G., Navarra, A.: Evaluation of recoverable-robust timetables on tree networks. In: Fiala, J., KratochvÃl, J., Miller, M. (eds.) IWOCA 2009. LNCS, vol. 5874, pp. 24–35. Springer, Heidelberg (2009)
Shafia, M.A., Sadjadi, S.J., Jamili, A., Tavakkoli-Moghaddam, R., Pourseyed Aghaee, M.: The periodicity and robustness in a single-track train scheduling problem. Appl. Soft Comput. J. 12, 440–452 (2012)
Jamili, A., Ghannadpour, S.F.: Computing the supplementary times and the number of required trains in operation plan studies under stochastic perturbations. In: Proceedings of 16th International IEEE Conference on Intelligent Transportation Systems, The Netherlands (2013)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Jamili, A. (2015). Urban Railway Operation Plan Subject to Disruption. In: Gavrilova, M., Tan, C., Saeed, K., Chaki, N., Shaikh, S. (eds) Transactions on Computational Science XXV. Lecture Notes in Computer Science(), vol 9030. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-47074-9_11
Download citation
DOI: https://doi.org/10.1007/978-3-662-47074-9_11
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-662-47073-2
Online ISBN: 978-3-662-47074-9
eBook Packages: Computer ScienceComputer Science (R0)