Lot-sizing for a single-stage single-product production system with rework of perishable production defectives

  • Original Paper
  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract.

We consider a single-stage single-product production system. Produced units may be non-defective, reworkable defective, or non-reworkable defective. The system switches between production and rework. After producing a fixed number (N) of units, all reworkable defective units are reworked. Reworkable defectives are perishable or can become technologically obsolete. We assume that the rework time and the rework cost increase linearly with the time that a unit is held in stock. Therefore, N should not be too large. On the other hand, N should not be too small either, since there are set-up times and costs associated with switching between production and rework. For a given N, we derive an explicit expression for the average profit (sales revenue minus costs). Using this expression, the optimal value for N can be determined numerically. Moreover, it is easy to perform a sensitivity analysis, as we illustrate.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

RID="*"

ID="*"The research of Dr. Ruud H. Teunter has been made possible by a fellowship of the Royal Netherlands Academy of Arts and Sciences. The research presented in this paper is part of the research on re-use in the context of the EU sponsored TMR project REVersed LOGistics (ERB 4061 PL 97-5650) in which take part the Otto-von-Guericke Universitaet Magdeburg (D), the Erasmus University Rotterdam (NL), the Eindhoven University of Technology (NL), INSEAD (F), the Aristoteles University of Thessaloniki (GR), and the University of Piraeus (GR). We thank the anonymous referees for their many helpful comments.

Correspondence to: R. H. Teunter

Rights and permissions

Reprints and permissions

About this article

Cite this article

H.Teunter, R., Flapper, S. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 25, 85–96 (2003). https://doi.org/10.1007/s00291-002-0105-3

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-002-0105-3

Navigation