A note on “The general lot sizing and scheduling problem”

  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract.

Fleischmann and Meyr (1997) develop a model for the lot sizing problem with sequence dependent setup costs. In this note we show that this model is limited to the case where production state between two consecutive periods is conserved only if the available capacity of the preceding period exceeds the minimum batch quantity. We generalize the model by modification.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ayşe Koçlar.

Additional information

Correspondence to: Haldun Süral

Rights and permissions

Reprints and permissions

About this article

Cite this article

Koçlar, A., Süral, H. A note on “The general lot sizing and scheduling problem”. OR Spectrum 27, 145–146 (2005). https://doi.org/10.1007/s00291-004-0181-7

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-004-0181-7

Keywords:

Navigation