Skip to main content
Log in

Planning order releases for an assembly system with random operation times

  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract.

A multi-stage assembly network is considered. A number of end items should be delivered at a certain time. Otherwise a delay cost is incurred. End items and components that are delivered before they are needed will cause holding costs. All operation times are independent stochastic variables. The objective is to choose starting times for different operations in order to minimize the total expected costs. We suggest an approximate decomposition technique that is based on repeated application of the solution of a simpler single-stage problem. The performance of our approximate technique is compared to exact results in a numerical study.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sven Axsäter.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Axsäter, S. Planning order releases for an assembly system with random operation times. OR Spectrum 27, 459–470 (2005). https://doi.org/10.1007/s00291-004-0186-2

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-004-0186-2

Keywords:

Navigation