Abstract
Within the realm of reverse logistics, remanufacturing has become renowned as a popular option in many reverse logistics settings. In remanufacturing, firms take back products at the end of their use, disassemble them to obtain components, and reassemble these components into a “good as new” remanufactured product. As a process, remanufacturing requires parts as an input, parts which are gained mostly from recovered products. As the quality of the returned products are not known in advance, likewise the amount of good quality parts recovered from the returned product is subject to uncertainty. In this paper, we develop two heuristics of different sophistication which take into consideration that the yields of disassembly are stochastic. The methodology is further illustrated with a numerical example, and performance of the heuristics is examined through a performance study. The performance study indicates excellent performance for the more sophisticated heuristic, but also reveals under which conditions the more simple heuristic can be recommended for application.




Similar content being viewed by others
References
de Brito MP (2004) Managing reverse logistics or reversing logistics management? PhD thesis, Erasmus University Rotterdam, The Netherlands
de Brito MP, Dekker R (2004) A framework for reverse logistics. In: Dekker R, Fleischmann M, Inderfurth K, Van Wassenhove LN (eds) Reverse logistics: quantitative models for closed-loop supply chains, Springer, Berlin, Heidelberg, New York, pp 3–27
Guide VDR (2000) Production planning and control for remanufacturing: industry practice and research needs. J Oper Manag 18:467–483
Guide VDR, Van Wassenhove LN (2001) Managing product returns for remanufacturing. Prod Oper Manag 10(2):142–155
Guide VDR, Van Wassenhove LN (2002) The reverse supply chain. Harvard Bus Rev 2–3 (February)
Guide VDR, Jayaraman V, Srivastava R, Benton WC (2000) Supply-chain management for recoverable manufacturing systems. Interfaces 30(3):125–142
Guide VDR, Jayaraman V, Linton J (2003) Building contingency planning for closed-loop supply chains with product recovery. J Oper Manag 21:259–279
Gupta SM, Taleb KN (1994) Scheduling disassembly. Int J Prod Res 32(8):1857–1866
Horngren CT, Datar SM, Foster G (2003) Cost accounting: a managerial emphasis. 11th edn. Prentice Hall, Uppder Saddle River
Inderfurth K, Langella IM (2003) An approach for solving disassemble-to-order problems under stochastic yields. In: Spengler T, Voss S, Kopfer H (eds) Logistik management: prozesse, systeme, ausbildung, Physica, Heidelberg, pp 309–331
Kim HJ, Lee DH, Xirouchakis P, Züst R (2003) Disassembly scheduling with multiple product types. Annals of the CIRP 52(1):403–406
Knight M, Linton JD (2004) The remanufacturing equation. Circuits Assem 26–31 (October)
Krikke H, le Blanc I, van de Velde S (2004) Product modularity and the design of closed loop supply chains. Calif Manage Rev 46:23–39
Lambert AJD, Gupta SM (2002) Demand-driven disassembly optimization for electronic products. J Electron Manuf 11(2):121–135
Langella IM (2005) Heuristics for demand driven disassembly planning. Comput Oper Res, to appear
Lee DH, Xirouchakis P (2004) A two-stage heuristic for disassembly scheduling with assembly product structure. J Oper Res Soc 55:287–297
Lee DH, Jim HJ, Choi G, Xirouchakis P (2003) Disassembly scheduling: integer programming models. Working paper, Department of Industrial Engineering, Hanyang University, Seoul
Ploog M (2004) Operative planung in recyclingunternehmen für elektro(nik)altgeräte. Shaker Verlag, Aachen
Porter ME, van der Linde C (1995) Green and competitive: ending the stalemate. Harvard Bus Rev 121–134 (September–October)
Rardin RL, Uzsoy R (2001) Experimental evaluation of heuristic optimization algorithms: a tutorial. Journal of Heuristics 7:261–304
Reinhardt FL (1999) Bringing the environment down to earth. Harvard Bus Rev 149–157 (July–August)
Seitz MA, Peattie K (2004) Meeting the closed loop challenge: the case of remanufacturing. Calif Manage Rev 46:74–89
Silver EA (2004) An overview of heuristic solution methods. J Oper Res Soc 55(9):936–954
Stock J, Speh T, Shear H (2002) Many happy (product) returns. Harvard Bus Rev 16–17 (July)
Taleb KN, Gupta SM (1997) Disassembly of multiple product structures. Comput Ind Eng 32(4):949–961
Taleb KN, Gupta SM, Brennan L (1997) Disassembly of complex product structures with parts and materials commonality. Prod Plan Control 8(3):255–269
Thierry M, Salomon M, Van Nunen J, Van Wassenhove L (1995) Strategic issues in product recovery management. Calif Manage Rev 37(2):114–135
Thorn BK, Rogerson P (2002) Take it back. IIE Solut 34–40 (April)
Toffel MW (2003) The growing strategic importance of end-of-life product management. Calif Manage Rev 45(3):102–129
Toffel MW (2004) Strategic management of product recovery. Calif Manage Rev 46(2):120–141
Veerakamolmal P, Gupta SM (1998) Optimal analysis of lot-size balancing for multiproducts selective disassembly. Int J Flex Autom Integr Manuf 6(3–4):245–269
Veerakamolmal P, Gupta SM (1999) Analysis of design efficiency for the disassembly of modular electronic products. J Electron Manuf 9(1):79–95
Yano CA, Lee HL (1995) Lot sizing with random yields: a review. Oper Res 43(2):311–334
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Inderfurth, K., Langella, I.M. Heuristics for solving disassemble-to-order problems with stochastic yields. OR Spectrum 28, 73–99 (2006). https://doi.org/10.1007/s00291-005-0007-2
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00291-005-0007-2