Abstract
In the present work, the working of an electro discharge machining process was studied in which four factors, namely pulse on time, duty cycle, discharge current, and gap voltage, were considered to be the controllable parameters, each at three levels, for monitoring three responses, namely material removal rate, tool wear ratio, and tool overcut. Statistical design of experiments using Taguchi’s orthogonal array (OA) technique has been utilized to determine the optimum level of process parameters so that they are least affected by noise factors for obtaining a robust design of the parameters. Acknowledging the limitation that Taguchi’s OA technique can determine optimal setting of controllable parameters for one output or response at a time, integrated fuzzy AHP and fuzzy TOPSIS methods were used in the scheme of multi-response experiment so that Taguchi’s OA technique may be applied successfully for parametric optimization. The results show that none of the factors were highly significant although discharge current had the highest contribution (31.63%) among all.
Similar content being viewed by others
References
Dewangan S, Gangopadhyay S, Biswas CK (2015) Multi-response optimization of surface integrity characteristics of EDM process using grey-fuzzy logic-based hybrid approach. Eng Sci Technol Int J 18:361–368. https://doi.org/10.1016/j.jestch.2015.01.009
Hsieh TY, Lu ST, Tzeng GH (2004) Fuzzy MCDM approach for planning and design tenders selection in public office buildings. Int J Proj Manag 22:573–584. https://doi.org/10.1016/j.ijproman.2004.01.002
Isiklar G, Buyukozkan G (2006) Using a multi-criteria decision making approach to evaluate mobile phone alternatives. Comput Stand Interfaces 29:265–274
Khan ZA, Siddiquee AN, Khan NZ et al (2014) Multi response optimization of wire electrical discharge machining process parameters using taguchi based grey relational analysis. Proc Mater Sci 6:1683–1695. https://doi.org/10.1016/j.mspro.2014.07.154
Kunieda M, Lauwers B, Rajurkar KP, Schumacher BM (2005) Advancing EDM through fundamental insight into the process. CIRP Ann Manuf Technol 54:64–87. https://doi.org/10.1016/S0007-8506(07)60020-1
Majumder M (2015) Impact of Urbanization on Water Shortage in Face of Climatic Aberrations. 35–48. https://doi.org/10.1007/978-981-4560-73-3
Nayak BB, Mahapatra SS (2013) Multi-response optimization of WEDM process parameters using the AHP and TOPSIS method. Int J Theor Appl Res Mech Eng 2:2319–3182
NPTEL IITB Module 5 design for reliability and quality; lecture 4: approach to robust design. http://www.nptel.ac.in/courses/112101005/downloads/Module_5_Lecture_4_sent.pdf. Accessed 18 July 2016
Puri AB, Bhattacharyya B (2003) An analysis and optimization of the geometrical inaccuracy due to wire lag phenomenon in WEDM. Int J Mach Tools Manuf 43:151–159
Ramakrishnan R, Karunamoorthy L (2008) Modeling and multi-response optimization of Inconel 718 on machining of CNC WEDM process. J Mater Process Technol 207:343–349. https://doi.org/10.1016/j.jmatprotec.2008.06.040
Ramakrishnan R, Karunamoorthy L, Sudhesh R, Kayalvizhi C (2003) Parametric optimization of CNC wire cut EDM based on Taguchi methodology. In: Proceedings 6th international conference on APORS. pp 579–590
Rupajati P, Soepangkat BOP, Pramujati B, Agustin HCK (2014) Optimization of recast layer thickness and surface roughness in the wire EDM process of AISI H13 tool steel using taguchi and fuzzy logic. Appl Mech Mater 493:529–534
S.K.Pattnaik, K.D.Mahapatra, M.Priyadarshini, et al (2015) Multi objective optimization of EDM process parameters using FUZZY TOPSIS Method. In: IEEE Spons 2"d International conference on innovations in information embedded and communications systems (IClIECS) 2015 ,pp 1–5. https://doi.org/10.1109/ICIIECS.2015.7192926
Saaty T (1977) A scaling method for priorities in hierarchical structures. J Math Psychol 15:234–281
Saaty TL (1980) The analytic hierarchy process. McGraw-Hill, New York
Senthil P, Vinodh S, Singh AK (2014) Parametric optimisation of EDM on Al–Cu/TiB2 in-situ metal matrix composites using TOPSIS method. Int J Mach Mach Mater 16:80–94
Sivapirakasam SP, Mathew J, Surianarayanan M (2011) Multi-attribute decision making for green electrical discharge machining. Expert Syst Appl 38:8370–8374. https://doi.org/10.1016/j.eswa.2011.01.026
Spedding TA, Wang ZQ (1997) Study on modeling of wire EDM process. J Mater Process Technol 69:18–28
Sun CC (2010) A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods. Expert Syst Appl 37:7745–7754. https://doi.org/10.1016/j.eswa.2010.04.066
Torfi F, Farahani RZ, Rezapour S (2010) Fuzzy AHP to determine the relative weights of evaluation criteria and Fuzzy TOPSIS to rank the alternatives. Appl Soft Comput J 10:520–528. https://doi.org/10.1016/j.asoc.2009.08.021
Tzeng G-H, Huang J-J (2011) Multiple attribute decision making: methods and applications. CRC Press, Taylor & Francis Group, Baca Raton
Acknowledgements
The authors are very grateful to Tool Room & Training Centre, Guwahati, Assam, for allowing us to use the die-sinking EDM facility at their premises.
Funding
This research did not receive any specific grant from funding agencies in the public, commercial, or not-for-profit sectors.
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
T. Roy declares that he has no conflict of interest. R.K. Dutta declares that he has no conflict of interest.
Ethical approval
This article does not contain any studies with human participants or animals performed by any of the authors.
Additional information
Communicated by V. Loia.
Rights and permissions
About this article
Cite this article
Roy, T., Dutta, R.K. Integrated fuzzy AHP and fuzzy TOPSIS methods for multi-objective optimization of electro discharge machining process. Soft Comput 23, 5053–5063 (2019). https://doi.org/10.1007/s00500-018-3173-2
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00500-018-3173-2