Skip to main content
Log in

An interval type-2 fuzzy MCDM model for work package subcontractor prequalification

  • Methodologies and Application
  • Published:
Soft Computing Aims and scope Submit manuscript

Abstract

The inherent role of the Main Contractors (MCs) and their responsibility to employers force them to consider an appropriate mechanism for evaluating the subcontractors (SCs). The past few decades witnessed the gradual prevalence of fuzzy set theory in different industries. The construction industry was not an exception either. It is in use now for SCs prequalification thanks to its competence in covering the flaws underlying the SC selection methods. Most previous researches employed Type-1 Fuzzy Sets (T1FSs) in SCs prequalification models. But, the result of the applying TIFSs to solve a SC prequalification could be simply misleading because it is principally a group (Multi-Criteria Decision Making) MCDM problem. An important limitation of T1FS assures the fact that it can handle the decision-making problem of only one person because its membership function is crisp, relying on his subjective viewpoint, and deterring it from revealing differing views among the experts. We aim to introduce a novel SCs prequalification method using Interval Type-2 Fuzzy Sets (IT2FSs) in a bid to rectify the linguistic flaws as well as differences of the experts’ views. Therefore, an integration of two methods, namely “Shannon Entropy Weight” and “Technique for Order Performance by Similarity to Ideal Solutions,” is used under IT2FS for solving the SC prequalification problem. In addition, a real case is considered to demonstrate the effectiveness of the proposed method.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3

Similar content being viewed by others

References

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mohammad Hassan Sebt.

Ethics declarations

Financial Disclosures

The authors have no relevant financial disclosures.

Conflict of interest

The authors declare that they have no conflict of interest.

Additional information

Communicated by V. Loia.

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Afshar, M.R., Shahhosseini, V. & Sebt, M.H. An interval type-2 fuzzy MCDM model for work package subcontractor prequalification. Soft Comput 25, 635–648 (2021). https://doi.org/10.1007/s00500-020-05173-3

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00500-020-05173-3

Keywords

Navigation