Skip to main content
Log in

RETRACTED ARTICLE: Numerical simulation and analysis of the three-step excavation of an extra-large cross section and a low flat-ratio railway tunnel

  • Focus
  • Published:
Soft Computing Aims and scope Submit manuscript

This article was retracted on 22 December 2022

This article has been updated

Abstract

The Xinbaishiyan tunnel in the reconstruction Chengdu–Kunming railway Ermeishan-Mipan section mainly runs through dolomite with dolomitic limestone, with an excavation area of 260 m2, a maximum span of 22.3 m, a maximum height of 14.4 m, a vector height of 7 m, and a rise-span ratio of 0.31. The tunnel has an extra-large cross section, and it is a low flat-ration railway tunnel. This paper mainly describes the finite element analysis for this tunnel excavation that was used to guide the construction. Finite element software was used to model the tunnel according to the engineering geological conditions of the tunnel. These engineering geological conditions included the rock mass, system bolts, middle pipe shed, steel arch and shotcrete, grouting layer, second lining and so on. Nonlinear construction phase analysis was adopted. The results showed that the maximum vertical deformation of the tunnel vault and the middle of the invert was about 34 mm. The vertical deformation of the tunnel could be divided into an acceleration deformation section, linear deformation section, deceleration deformation section, and stable deformation section. The maximum horizontal deformation in the middle of the side wall was about 12.3 mm. Under the effect of the initial support, the equivalent stress of the side wall gradually increased with the excavation of the steps and the increase in the support structure. The axial force of the bolt in the middle of the side wall was larger than that in other places and the axial force of the middle pipe shed went along with the excavation of the tunnel in waves. The steel arch and the shotcrete had the maximum effective stress at the arch shoulder, which played the role of the deformation and pressure for the surrounding rock. During the construction, the length and height of the three-step method had to be set reasonably. The middle pipe shed and the system bolt supported the rock mass together. In the construction of the extra-large cross section and the flat tunnel, there was no need to set up temporary support, which was convenient for mechanical excavation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
Fig. 17
Fig. 18
Fig. 19
Fig. 20
Fig. 21

Similar content being viewed by others

Availability of data and material

The data in this paper include calculation result data and finite element analysis data. All the data used to support the findings of this study are included within the article. There are not any restrictions on data access.

Code availability

Not Applicable.

Change history

References

  • Dammyr Ø, Nilsen B, Gollegger J (2017) Feasibility of tunnel boring through weakness zones in deep Norwegian subsea tunnels. Tunnel Undergr Space Technol 69:133–146

    Article  Google Scholar 

  • Geng D, Shi Y, Yang J, Yang F (2016) Research on forepoling force of long and large pipe roof for shallow tunnel large section under existing highway. J Huazhong Univ Sci Technol (Natural Science Edition) 44(6):98–103

    Google Scholar 

  • Huo W, Yuan B, Wang F, Jiang L (2012) Succesive collapse resistance analysis of steel framework mounted viscous dampers. World Earthq Eng 28(4):111–115

    Google Scholar 

  • Janin JP, Dias D, Emeriault F, Kastner R, Le Bissonnais H, Guilloux A (2015) Numerical back-analysis of the southern Toulon tunnel measurements: a comparison of 3D and 2D approaches. Eng Geol 195:42–52

    Article  Google Scholar 

  • Jiang L, Ma K, Zhang H, Wu Q, Lu H, Yang Q (2019) Seismic behavior of shear connectors of steel vierendeel sandwich plate. Math Prob Eng 2019:14

    Article  Google Scholar 

  • Ki-Il S, Cho G-C, Chang S-B, Lee I-M (2013) Beam–spring structural analysis for the design of a tunnel pre-reinforcement support system. Int J Rock Mech Min Sci 59:139–150

    Article  Google Scholar 

  • Kontogianni VA, Stiros SC (2015) Induced deformation during tunnel excavation: Evidence from geodetic monitoring. Eng Geol 79(1–2):115–126

    Google Scholar 

  • Shi C, Cao C, Lei M (2017) Construction technology for a shallow-buried underwater interchange tunnel with a large span. Tunnel Undergr Space Technol 70:317–329

    Article  Google Scholar 

  • Wang W, Mei Z (2017) Study of application of bench method to shallow-buried asymmetrically-pressured railway tunnel of super-large cross-section. Tunnel Constr 37(12):1578–1584

    Google Scholar 

  • Xi J-m, Wang M-m, Feng Xu et al (2015) Numerical simulation of construction method for shallow buried large section tunnel. J xi’an Univ Sci Technol 35(5):602–610

    Google Scholar 

  • Zhang J, Ou X, Zheng Q et al (2018) Study on the safety of large section tunnel under double layer initial support. Modern Tunnel Technol 55(6):108–116

    Google Scholar 

  • Zhou Y, Zhu Y, Wang S, Wang H, and Wang Z (2019) Rotational failure mechanism for face stability of circular shield tunnels in frictional soils,” Adv Civ Eng Volume 2019, Article ID 7167802

  • Zuo Q, Wu Y, Yan T (2018) Analysis of time-space effect for surrounding rock deformation in super-large cross section slate tunnel during construction period. J Disaster Prevent Mitig Eng 38(2):233–243

    Google Scholar 

Download references

Funding

No funding is received.

Author information

Authors and Affiliations

Authors

Contributions

WXH, SFX, ZZZ, ZYG and MYS have all participated in the designing framework, collecting data, analysis and interpretation of data, drafting, reviewing and approving the manuscript.

Corresponding author

Correspondence to Shifeng Xue.

Ethics declarations

Conflicts of interest

The authors declare that they have no conflicts of interest.

Additional information

Communicated by Vicente Garcia Diaz.

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

This article has been retracted. Please see the retraction notice for more detail:https://doi.org/10.1007/s00500-022-07768-4

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Huo, W., Xue, S., Zhao, Z. et al. RETRACTED ARTICLE: Numerical simulation and analysis of the three-step excavation of an extra-large cross section and a low flat-ratio railway tunnel. Soft Comput 25, 12117–12130 (2021). https://doi.org/10.1007/s00500-021-05862-7

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00500-021-05862-7

Keywords

Navigation