Development of an extended commissioning program for temporary 220 kV cable connections

  • CIGRE 2024
  • Published:
e+i Elektrotechnik und Informationstechnik Aims and scope Submit manuscript

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12

References

  1. IEC 60137:2017. Insulated bushings for alternating voltages above 1000 V

  2. IEC 62271-203:2003. High-voltage switchgear and controlgear—Part 203: AC gas-insulated metal-enclosed switchgear for rated voltages above 52 kV

  3. IEC 62067:2011. Power cables with extruded insulation and their accessories for rated voltages above 150 kV up to 500 kV—Test methods and requirements

  4. CIGRE TB907 (2023) Mobile substations incorporating HV GIS

  5. CIGRE TB825 (2021) Maintenance of HV cable systems

  6. CIGRE TB912 (2023) Condition evaluation and lifetime strategy of HV sable systems

  7. Weinlein A, Peters U, Schröder G et al (2015) Long-term experiences and review with offline and online PD measurements on-site on EHV XLPE cable systems 330 kV to 500 kV. 9th International Conference on Insulated Power Cables

    Google Scholar 

  8. Krüger M, Kraetge A, Koch M et al (2009) New diagnostic tools for high voltage bushings. 16th International Symposium on High Voltage Engineering

    Google Scholar 

  9. Werelius P, Holmgren B, Gafvert U (1998) Diagnosis of medium voltage XLPE cables by high voltage dielectric spectroscopy. 6th International Conference on Conduction and Breakdown in Solid Dielectrics

    Book  Google Scholar 

  10. IEEE Std C57.19.01-2017. IEEE standard for performance characteristics and dimensions for power transformer and reactor bushings

  11. CIGRE TB755 (2019) Transformer bushing reliability

  12. CIGRE TB445 (2011) Guide for transformer maintenance

  13. CIGRE TB761 (2019) Condition assessment of power transformers

  14. CIGRE TB728 (2018) On-side partial discharge assessment of HV and EHV cable systems

  15. IEC 60885-3:2015. Electrical test methods for electric cables—Part 3: test methods for partial discharge measurements on lengths of extruded power cables

  16. Lemke E, Strehl T (2004) Möglichkeiten und Grenzen der TE-Fehlstellenortung in kunststoffisolierten Energiekabeln unter Vor-Ort-Bedingungen. ETG-Fachtagung – Diagnostik elektrischer Betriebsmittel

    Google Scholar 

  17. Rethmeier K, Krüger M, Kraetge A (2008) Experiences in On-site Partial Discharge Measurements and Prospects for PD Monitoring

    Book  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Alexander Pirker.

Additional information

Publisher’s Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Paper submitted for the CIGRE Session 2024, SC-B1, August 25–30, 2024. A. Machl is an OVE member.

A. Machl is an OVE member.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Pirker, A., Machl, A. Development of an extended commissioning program for temporary 220 kV cable connections. Elektrotech. Inftech. 141, 619–629 (2024). https://doi.org/10.1007/s00502-024-01276-z

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00502-024-01276-z

Navigation