Effects of project size and resource constraints on project duration through priority rule-base heuristics

  • Published:
Artificial Intelligence Review Aims and scope Submit manuscript

Abstract

Priority rules are one of the frequently used methods in project programming with resource-constraints. In this paper, the effects of project size and number of resource constraints on project duration are compared to the performances of pre-selected priority rules. Ten projects in different sizes have been programmed with 3, 5, 7, 9, and 11 limited-resource conditions by means of MRPL (Maximum Remaining Path Length), LFT (Latest Finish Time), MNSLCK (Minimum Slack Time), EFT (Earliest Finish Time), and LST (Latest Start Time) priority rules. When the number of resource constraints is low, the performance of MRPL is generally observed to be higher. As the number of resource constraints increases, a decrease in the performance of MRPL is observed in contrast with an increase in the performance of LFT.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Abbasi GY, Arabiat YA (2000) A Heuristic to maximize the net present value for resource-constrained project scheduling problems. Proj Manage J 32(2): 17–24

    Google Scholar 

  • Ahuja HN (1976) Construction performance control by network. Wiley Publishing, New York

    Google Scholar 

  • Brooks GH, White CR (1965) An algorithm for finding optimal or near optimal solutions to the production scheduling problem. J Ind Eng 16: 34–40

    Google Scholar 

  • David EW (1973) Project scheduling under resource constraints—historical review and categorization of procedures. AIIE Trans 5(4): 297–312

    Google Scholar 

  • David EW, Patterson JH (1975) A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Manage Sci 21: 944–955

    Article  Google Scholar 

  • Elmaghraby SE (1977) Activity networks. Wiley Publishing, New York

    MATH  Google Scholar 

  • Elsayed EA (1982) Algorithms for project scheduling with resource constraints. Int J Prod Res 20: 95–103

    Article  Google Scholar 

  • Klein R (2000) Project scheduling with time-varying resource constraints. Int J Prod Res 38(16): 3937–3952

    Article  MATH  Google Scholar 

  • Leu SS, Chen AT, Yang CH (1999) Fuzzy optimal model for resource-constrained construction scheduling. J Comput Civil Eng 13(3): 207–216

    Article  Google Scholar 

  • Morse L, Whitehouse G (1988) A study of combining heuristics for scheduling projects with limited multiple resources. Comput Ind Eng 15(1–4): 153–161

    Article  Google Scholar 

  • Ozdamar L, Ulusoy G (1996) A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis. Eur J Oper Res 89: 400–407

    Article  Google Scholar 

  • Schirmer A (1999) Resource constrained project scheduling: an evaluation of adaptive control schemes for parameterized sampling Heuristic. Int J Prod Res 39(7): 1343–1365

    Article  Google Scholar 

  • Sung CS, Lim SK (1997) A scheduling procedure for a general class of resource-constrained projects. Comput Ind Eng 32(1): 9–17

    Article  Google Scholar 

  • Talbot FB (1982) Resource-constrained project scheduling with time-resource tradeoffs: the non-preemptive case. Manage Sci 28: 1197–1210

    Article  MATH  Google Scholar 

  • Tsai DM, Chiu HN (1996) Two Heuristics for scheduling multiple projects with resource constraints. Constr Manage Econ 14: 325–340

    Article  Google Scholar 

  • Whitehouse GE, Brown JR (1979) GENRES: an extension of Brooks algorithm for project scheduling with resource constraints. Comput Ind Eng 3: 261–268

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Murat Gunduz.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kanit, R., Ozkan, O. & Gunduz, M. Effects of project size and resource constraints on project duration through priority rule-base heuristics. Artif Intell Rev 32, 115–123 (2009). https://doi.org/10.1007/s10462-009-9138-1

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10462-009-9138-1

Keywords

Navigation