Revenue sharing for resource reallocation among project activity contractors

  • S.I.: SING 14
  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

Outsourcing project activities to contractors has become more and more popular in recent years, and activity contractors can increase the revenue of a project through cooperation. In this paper we consider cooperation between activity contractors through resource reallocation, and address two main issues. First, we seek to find the optimal scheme for resource reallocation among contractors. To this end, a linear programming model is established, and some properties of the optimal resource reallocation scheme are discussed. Second, we propose several revenue sharing schemes for contractors based on a cooperative game theory framework. Three schemes are introduced and compared: a scheme in the core, the Shapley value, and a proportional revenue sharing scheme. We show that the cooperative game of activity contractors in a general project network does not necessarily have a nonempty core. However, we identify a special class of project network for which the core of the cooperative game of activity contractors always exists and an allocation in the core is proposed based on shadow prices. The managerial insights we obtain in this paper are as follows. (i) Contractors should cooperate. (ii) Resources should not be transferred between contractors with high transferring costs. (iii) Resources are always transferred from contractors on non-critical paths to contractors on critical paths, and on critical paths, resources are always transferred from low efficiency contractors to high efficiency contractors.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

Similar content being viewed by others

References

  • Araújo, M. C. B. D., Alencar, L. H., & Mota, C. M. D. M. (2017). Project procurement management: A structured literature review. International Journal of Project Management, 35(3), 353–377.

    Article  Google Scholar 

  • Bandyopadhyay, S., & Pathak, P. (2007). Knowledge sharing and cooperation in outsourcing projects-A game theoretic analysis. Decision Support Systems, 43(2), 349–358.

    Article  Google Scholar 

  • Bergantiños, G., & Sânchez, E. (2002). How to distribute costs associated with a delayed project. Annals of Operations Research, 109(1–4), 159–174.

    Article  Google Scholar 

  • Bondareva, O. N. (1963). Some applications of linear programming methods to the theory of cooperative games. Problemi Kibernitiki, 10, 119–C139.

    Google Scholar 

  • Boyd, S., & Vandenberghe, L. (2004). Convex optimization. New York: Cambridge University Press.

    Book  Google Scholar 

  • Brânzei, R., Ferrari, G., Fragnelli, V., & Tijs, S. (2002). Two approaches to the problem of sharing delay costs in joint projects. Annals of Operations Research, 109(1–4), 359–374.

    Article  Google Scholar 

  • Brucker, P., Drexl, A., Möhring, R., & Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3–41.

    Article  Google Scholar 

  • Castro, J., Gómez, D., & Tejada, J. (2007). A project game for PERT networks. Operations Research Letters, 35(6), 791–798.

    Article  Google Scholar 

  • Castro, J., Gómez, D., & Tejada, J. (2014). Allocating slacks in stochastic PERT network. Central European Journal of Operations Research, 22(1), 37–52.

    Article  Google Scholar 

  • Choi, M., Brand, M., & Kim, J. (2009). A feasibility evaluation on the outsourcing of quality testing and inspection. International Journal of Project Management, 27(1), 89–95.

    Article  Google Scholar 

  • Estévez-Fernández, A. (2012). A game theoretical approach to sharing penalties and rewards in projects. European Journal of Operational Research, 216(3), 647–657.

    Article  Google Scholar 

  • Estévez-Fernández, A., Borm, P., & Hamers, H. (2007). Project games. International Journal of Game Theory, 36(2), 149–176.

    Article  Google Scholar 

  • Gillies, D. B. (1959). Solutions to general non-zero-sum games. Contributions to the theory of games, 4, 47–85.

    Google Scholar 

  • Hall, N. G. (2016). Research and teaching opportunities in project management. In Optimization challenges in complex, networked and risky systems (pp. 329–388). INFORMS.

  • Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1–14.

    Article  Google Scholar 

  • Jiang, J. J., Gary, K., Chia-An, T. J., & Yuzhu, L. (2018). Managing multiple-supplier project teams in new software development. International Journal of Project Management, 36(7), 925–939.

    Article  Google Scholar 

  • Kolisch, R. (1996). Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research, 90(2), 320–333.

    Article  Google Scholar 

  • Krüger, D., & Scholl, A. (2010). Managing and modeling general resource transfers in (multi-) project scheduling. Or Spectrum, 32(2), 369–394.

    Article  Google Scholar 

  • Mingozzi, A., Maniezzo, V., Ricciardelli, S., & Bianco, L. (1998). An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation. Management Science, 44(5), 714–729.

    Article  Google Scholar 

  • Montoya-Torres, J. R., Gutierrez-Franco, E., & Pirachicán-Mayorga, Carolina. (2010). Project scheduling with limited resources using a genetic algorithm. International Journal of Project Management, 28(6), 619–628.

    Article  Google Scholar 

  • Naphade, K. S., Wu, S. D., & Storer, R. H. (1997). Problem space search algorithms for resource-constrained project scheduling. Annals of Operations Research, 70, 307–326.

    Article  Google Scholar 

  • Nishizaki, I., Hayashida, T., & Shintomi, Y. (2016). A core-allocation for a network restricted linear production game. Annals of Operations Research, 238(1–2), 389–410.

    Article  Google Scholar 

  • O’Neill, B. (1982). A problem of rights arbitration from the Talmud. Mathematical Social Sciences, 2(4), 345–371.

    Article  Google Scholar 

  • Owen, G. (1975). On the core of linear production games. Mathematical Programming, 9(1), 358–370.

    Article  Google Scholar 

  • Peleg, B., & Sudhölter, P. (2007). Introduction to the theory of cooperative games (2nd ed.). Berlin: Springer.

    Google Scholar 

  • Peng, W., & Wang, C. (2009). A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution. International Journal of Project Management, 27(6), 600–609.

    Article  Google Scholar 

  • Platz, T. T., & Hamers, H. (2015). On games arising from multi-depot Chinese postman problems. Annals of Operations Research, 235(1), 675–692.

    Article  Google Scholar 

  • Reyck, B. D., & Herroelen, W. A. (1998). branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research, 111(1), 152–174.

    Article  Google Scholar 

  • Samet, D., & Zemel, E. (1984). On the core and dual set of linear programming games. Mathematics of Operations Research, 9(2), 309–316.

    Article  Google Scholar 

  • Schwindt, C., & Zimmermann, J. (2014). Handbook on project management and scheduling 1. Berlin: Springer.

    Google Scholar 

  • Shapley, L. S. (1953). A value for n-person games. Annals of Mathematics Studies, 28, 307–318.

    Google Scholar 

  • Shapley, L. S. (1967). On balanced sets and cores. Naval Research Logistics Quarterly, 14, 453–460.

    Article  Google Scholar 

  • Shapley, L. S., & Shubik, M. (1969). Pure competition, coalitional power, and fair division. International Economic Review, 10(3), 337–362.

    Article  Google Scholar 

  • Suijs, J., Borm, P., Hamers, H., Quant, M., & Koster, M. (2005). Communication and cooperation in public network situations. Annals of Operations Research, 137(1), 117–140.

    Article  Google Scholar 

  • Tormos, P., & Lova, A. (2001). A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research, 102(1–4), 65–81.

    Article  Google Scholar 

  • Valls, V., Francisco, B., & Quintanilla, S. (2004). A population-based approach to the resource-constrained project scheduling problem. Annals of Operations Research, 131(1–4), 305–324.

    Article  Google Scholar 

  • Young, H. P. (1987). On dividing an amount according to individual claims or liabilities. Mathematics of Operations Research, 12, 398–414.

    Article  Google Scholar 

  • Zeng, Y., Zhang, L., Cai, X., & Li, J. (2018). Cost sharing for capacity transfer in cooperating queueing systems. Production and Operations Management, 27(4), 644–662.

    Article  Google Scholar 

Download references

Acknowledgements

The authors are grateful for the constructive comments of the department editor and the referees, which have significantly improved the paper. This work was partially supported by the National Science Foundation of China (NSFC) (Nos. 71732003, 71501093, and 71871114), the Leading Talent Program of Guangdong Province (No. 2016LJ06D703), the Science and Technology Development Fund, Macau SAR (File No. FDCT/027/2016/A1), the Postdoctoral Science Foundation of China (No. 2019M653386), and the International Postdoctoral Exchange Fellowship Program.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jing Zhou.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Lin, X., Zhou, J., Zhang, L. et al. Revenue sharing for resource reallocation among project activity contractors. Ann Oper Res 301, 121–141 (2021). https://doi.org/10.1007/s10479-020-03753-y

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10479-020-03753-y

Keywords

Navigation