Abstract
This paper deals with a permutation flow-shop scheduling problem with finite intermediate storage (PFSFIS) between successive machines so as to minimize makespan. In such a problem the intermediate storage capacity constraints are considered besides the machine-related constraints usually discussed in the general permutation flow-shop. This feature adds extra difficulties to the scheduling problem. In this paper, we present some new block properties and a speed-up method using a forward-backward hybrid algorithm to compute makespan. Applied in a tabu search algorithm, the new block properties greatly reduce the neighborhood size and thus shorten the search time. Also, the speed-up method eliminates redundant computation for the objective function and reduces a majority of the running time. Computational experiments (up to 200 jobs and 20 machines) are given to demonstrate the effectiveness of new block neighborhood characteristics and the speed-up method. Compared with the results yielded by the best-known algorithm, the objective function is improved by 0.14% if the new block neighborhood characteristics are used; furthermore, the running time is reduced by 53.7% on the average if the speed-up method is used. Under the condition that both of the algorithms have the same running time the objective function is improved by 0.24% if both of the two above improvement methods are applied in the original tabu search.
Similar content being viewed by others
References
A. Agnetis D. Pacciarelli F. Rossi (1997) ArticleTitleBatch scheduling in a two–machine flow shop with limited buffer Discrete Applied Mathematics 72 243–260 Occurrence Handle10.1016/0166-218X(95)00114-7
H. Das P. T. Cummings M. D. Le Van (1990) ArticleTitleScheduling of serial multiproduct batch processes via simulated annealing Computers and Chemical Engineering 14 1351–1362 Occurrence Handle10.1016/0098-1354(90)80017-6
D. E. Deal T. Yang S. Hallquist (1994) ArticleTitleJob scheduling in petrochemical production: two-stage processing with finite intermediate storage Computers and Chemical Engineering 18 IssueID4 333–344 Occurrence Handle10.1016/0098-1354(94)85030-5
S.K. Dutta A.A. Cunningham (1975) ArticleTitleSequencing two machine flowshops with finite intermediate storage Management Science 21 989–996
F. Glover (1989) ArticleTitleTabu search-Part I Operations Research Society of America Journal on Computing 1 190–206
F. Glover (1990) ArticleTitleTabu search-Part II Operations Research Society of America Journal on Computing 2 4–32
J. Grabowski J. Pempera (2001) ArticleTitleNew block properties for the permutation flow shop problem with application in tabu search Journal of the Operational Research Society 52 210–220
J. N. D. Gupta (1988) ArticleTitleTwo-state hybrid flowshop scheduling problem Journal of the Operational Research Society 39 359–364
I.S. Khosla (1995) ArticleTitleThe scheduling problem where multiple machines compete for a common local buffer European Journal of Operational Research 84 330–342 Occurrence Handle10.1016/0377-2217(93)E0352-X
B. A. Norman (1999) ArticleTitleScheduling flowshops with finite buffers and sequence dependent setup times Computers and Industrial Engineering 36 IssueID1 163–177 Occurrence Handle10.1016/S0360-8352(99)00007-8
E. Nowicki C. Smutnicki (1996) ArticleTitleA fast tabu search algorithm for the permutation flow-shop problem European Journal of Operational Research 91 160–175 Occurrence Handle10.1016/0377-2217(95)00037-2
E. Nowicki (1999) ArticleTitleThe permutation flow shop with buffers: a tabu search approach European Journal of Operational Research 116 205–219 Occurrence Handle10.1016/S0377-2217(98)00017-4
C.H. Papadimitriou P.C. Kanellakis (1980) ArticleTitleFlowshop scheduling with limited temporary storage Journal of Associate of Computer Machinery 27 533–549
T. Prabhakar (1974) ArticleTitleA production scheduling problem with sequencing considerations Management Science 21 34–42
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Li, S., Tang, L. A tabu search algorithm based on new block properties and speed-up method for permutation flow-shop with finite intermediate storage. J Intell Manuf 16, 463–477 (2005). https://doi.org/10.1007/s10845-005-1658-1
Issue Date:
DOI: https://doi.org/10.1007/s10845-005-1658-1