Skip to main content
Log in

Idle vehicle circulation policies in a semiconductor FAB

  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

Abstract

Idle vehicle handling is addressed for the path-based automated material handling system (AMHS) in a semiconductor fabrication line. Since a typical semiconductor fabrication line has a single path in each bay and no sidetracks to park idle vehicles, a vehicle should be dispatched to somewhere if necessary even without a new assignment to prevent blocking of other vehicles. We investigate the continuous-move policy, the move-when-necessary policy and their variants. Our simulations show that the idle vehicle circulation policy significantly affects the AMHS productivity, so the policy should be carefully designed for the AMHS instance.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Bahri, N., Reiss, J., & Doherty, B. (2001). A comparison of unified vs. segregated automated material handling. In Proceedings of IEEE International Symposium on Semiconductor Manufacturing, pp. 3–6.

  • Brooks Automation Inc. (2006). AutoMod 12.1 User’s Guide.

  • Bruno G., Ghiani G., Improta G. (2000) Dynamic positioning of idle automated guided vehicles. Journal of Intelligent Manufacturing 11: 209–215 doi:10.1023/A:1008947018074

    Article  Google Scholar 

  • Chang S.-H., Egbelu P.J. (1996) Dynamic relative positioning of AGVs in a loop layout to minimize mean system response time. International Journal of Production Research 34: 1655–1673 doi:10.1080/00207549608904989

    Article  Google Scholar 

  • Egbelu P.J. (1993) Positioning of automated guided vehicles in a loop layout to improve response time. European Journal of Operational Research 71: 32–44 doi:10.1016/0377-2217(93)90258-O

    Article  Google Scholar 

  • Gademann A.J.R.M., van de Velde S.L. (2000) Positioning automated guided vehicles in a loop layout. European Journal of Operational Research 127: 565–573 doi:10.1016/S0377-2217(99)00341-0

    Article  Google Scholar 

  • Ganesharajah T., Hall N.G., Sriskandarajah C. (1998) Design and operational issues in AGV-served manufacturing systems. Annals of Operations Research 76: 109–154 doi:10.1023/A:1018936219150

    Article  Google Scholar 

  • Hu C.-H., Egbelu P.J. (2000) A framework for the selection of idle home locations in an automated guided vehicle system. International Journal of Production Research 38: 543–562 doi:10.1080/002075400189293

    Article  Google Scholar 

  • Kim K.H. (1995) Positioning of automated guided vehicles in a loop layout to minimize the mean vehicle response time. International Journal of Production Economics 39: 201–214 doi:10.1016/0925-5273(95)00022-G

    Article  Google Scholar 

  • Kim B., Oh S., Shin J., Jung M., Chae J., Lee S. (2007) Effectiveness of vehicle reassignment in a large scale overhead hoist transport system. International Journal of Production Research 45: 789–802 doi:10.1080/00207540600675819

    Article  Google Scholar 

  • Koo P.-H., Jang J., Shu J. (2005) Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first. International Journal of Flexible Manufacturing Systems 17: 23–38 doi:10.1007/s10696-005-5992-6

    Article  Google Scholar 

  • Kuo C.-H. (2002) Modelling and performance evaluation of an overhead hoist transport system in a 300 mm fabrication plant. International Journal of Advanced Manufacturing Technology 20: 153–161 doi:10.1007/s001700200137

    Article  Google Scholar 

  • Le-Anh T., De Koster M.B.M. (2006) A review of design and control of automated guided vehicle systems. European Journal of Operational Research 171: 1–23 doi:10.1016/j.ejor.2005.01.036

    Article  Google Scholar 

  • Lee S. (2007) Locating idle vehicles in tandem-loop automated guided vehicle systems to minimize the maximum response time. IEMS 6: 125–135

    Google Scholar 

  • Lee C., Ventura J.A. (2001) Optimal dwell point location of automated guided vehicles to minimize mean response time in a loop layout. International Journal of Production Research 39: 4013–4031 doi:10.1080/00207540010005060

    Article  Google Scholar 

  • Lin J.T., Wang F.K., Yang C.J. (2005) The performance of the number of vehicles in a dynamic connecting transport AMHS. International Journal of Production Research 43: 2263–2276 doi:10.1080/00207540500034133

    Article  Google Scholar 

  • Montoya-Torres J.R. (2006) A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Production Planning and Control 17: 648–663 doi:10.1080/09537280600900774

    Article  Google Scholar 

  • Qiu L., Hsu W., Huang S., Wang H. (2002) Scheduling and routing algorithms for AGVs: A survey. International Journal of Production Research 40: 745–760 doi:10.1080/00207540110091712

    Article  Google Scholar 

  • Ventura J.A., Lee C. (2003) Optimally locating multiple dwell points in a single loop guide path system. IIE Transactions 35: 727–737 doi:10.1080/07408170304346

    Article  Google Scholar 

  • Vis I.F.A. (2006) Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research 170: 677–709 doi:10.1016/j.ejor.2004.09.020

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Byung-In Kim.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kim, BI., Park, J. Idle vehicle circulation policies in a semiconductor FAB. J Intell Manuf 20, 709–717 (2009). https://doi.org/10.1007/s10845-008-0159-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10845-008-0159-4

Keywords

Navigation