Abstract
We present a decision-support framework for speeding up the ramp-up of modular assembly systems by learning from past experience. Bringing an assembly system to the expected level of productivity requires engineers performing mechanical adjustments and changes to the assembly process to improve the performance. This activity is time-consuming, knowledge-intensive and highly dependent on the skills of the engineers. Learning the ramp-up process has shown to be effective for making progress faster. Our approach consists of automatically capturing information about the changes made by an operator dealing with disturbances, relating them to the modular structure of the machine and evaluating the resulting system state by analysing sensor data. The feedback thus obtained on applied adaptations is used to derive recommendations in similar contexts. Recommendations are generated with a variant of the k-nearest neighbour algorithm through searching in a multidimensional space containing previous system states. Applications of the framework include knowledge transfer among operators and machines with overlapping structure and functionality. The application of our method in a case study is discussed.





Similar content being viewed by others
Explore related subjects
Discover the latest articles and news from researchers in related subjects, suggested using machine learning.Notes
\(k\) is usually a small odd integer.
References
Aha, D. W., Kibler, D., & Albert, M. K. (1991). Instance-based learning algorithms. Machine Learning, 6(1), 37–66.
Almgren, H. (1999a). Pilot production and manufacturing start-up in the automotive industry—Principles for improved peformance. PhD thesis, Department of Operations Management and Work Organization, Chalmers University of Technology, Gothenburg, Sweden.
Almgren, H. (1999b). Start-up of advanced manufacturing system—A case study. Integrated Manufacturing Systems, 10(3), 126–135.
Arai, T., Aiyama, Y., Sugi, M., & Ota, J. (2001). Holonic assembly system with plug and produce. Computers in Industry, 46, 289– 299.
Argote, L., & Epple, D. (1990). Learning curves in manufacturing. Science, 247(23), 920–924.
Argote, L., & Ingram, P. (2000). Knowledge transfer: A basis for competitive advantage in firms. Organizational Behavior and Human Decision Processes, 82(1), 150–169.
Argote, L., & Miron-Spektor, E. (2011). Organizational learning: From experience to knowledge. Organization Science, 22(5), 1123– 1137.
Beyer, K. S., Goldstein. J., Ramakrishnan, R., & Shaft, U. (1999). When is “nearest neighbor” meaningful? In Proceedings of the 7th international conference on database theory.
Carrillo, J. E., & Gaimon, C. (2000). Improving manufacturing performance through process change and knowledge creation. Management Science, 46(2), 265–288.
Cooke, N. J. (1994). Varieties of knowledge elicitation techniques. International Journal of Human-Computer Studies, 41(6), 801–849.
Cover, T., & Hart, P. (1967). Nearest neighbor pattern classification. IEEE Transactions on Information Theory, 13(1), 21–27.
Dudani, S. A. (1976). The distance-weighted k-nearest-neighbor rule. IEEE Transactions on Systems, Man and Cybernetics, 6(4), 325–327.
Dutton, J. M., Thomas, A., & Butler, J. E. (1984). The history of progress functions as a managerial technology. Business History Review, 58(2), 204–233.
Fjällström, S., Säfsten, K., Harlin, U., & Stahre, J. (2009). Information enabling production ramp-up. Journal of Manufacturing Technology Management, 20(2), 178–196.
Frei, R., Ribeiro, L., Barata, J., & Semere, D. (2007). Evolvable assembly systems: Towards user friendly manufacturing. In Proceedings of the 2007 IEEE international symposium on assembly and manufacturing.
García-Laencina, P. J., Sancho-Gómez, J., Figueiras-Vidal, A. R., & Verleysen, M. (2008). K-nearest neighbours based on mutual information for incomplete data classification. In Proceedings of the 16th european symposium on artificial neural networks, pp. 37–42.
Glock, C. H., Jaber, M. Y., & Zolfaghari, S. (2012). Production planning for a ramp-up process with learning in production and growth in demand. International Journal of Production Research, 50(20), 5707–5718.
Jaber, M. Y. (Ed.). (2011). Learning curves: Theory, models, and applications. Boca Raton, FL: CRC Press.
Kang, J., Ryu, K., & Kim, K. (2006). Deriving stacking strategies for export containers with uncertain weight information. Journal of Intelligent Manufacturing, 17(4), 399–410.
Koren, Y., Heisel, U., Jovane, F., Moriwaki, T., Pritschow, G., Ulsoy, G., et al. (1999). Reconfigurable manufacturing systems. CIRP Annals Manufacturing Technology, 48, 527–540.
Li, X., Shi, D., Charastrakul, V., & Zhou, J. (2009). Advanced P-tree based K-nearest neighbors for customer preference reasoning analysis. Journal of Intelligent Manufacturing, 20(5), 569–579.
Lin, H. L. (2012). The use of the Taguchi method with grey relational analysis and a neural network to optimize a novel GMA welding process. Journal of Intelligent Manufacturing, 23(5), 1671–1680.
Marsland, S (2009). Machine learning: An algorithmic perspective. Boca Raton, FL: Chapman and Hall/CRC.
Mehrabi, M., Ulsoy, A., & Koren, Y. (2000). Reconfigurable manufacturing systems: Key to future manufacturing. Journal of Intelligent Manufacturing, 11(4), 403–419.
Nembhard, H., & Birge, J. (1998). A startup procedure for process industries using a multiple objective nonlinear program. IEE Transactions, 30(4), 291–300.
Ngwenyama, O., Guergachi, A., & McLaren, T. (2007). Using the learning curve to maximize IT productivity: A decision analysis model for timing software upgrades. International Journal of Production Economics, 105(2), 524–535.
Nonaka, I. (1994). A dynamic theory of organizational knowledge creation. Organization Science, 5(1), 14–37.
Nonaka, I., & von Krogh, G. (2009). Tacit knowledge and knowledge conversion: Controversy and advancement in organizational knowledge creation theory. Organization Science, 20(3), 635–652.
Oates, R. F., Scrimieri, D., & Ratchev, S. (2012). Accelerated ramp-up of assembly systems through self-learning. In Proceedings of the 6th IFIP WG 5.5 international precision assembly seminar (pp. 175–182). Berlin: Springer.
Patel, J., & Choi, S. K. (2012). An enhanced classification approach for reliability estimation of structural systems. Journal of Intelligent Manufacturing. doi:10.1007/s10845-012-0702-1.
Samet, H. (2006). Foundations of multidimensional and metric data structures. San Francisco, CA: Morgan Kaufmann.
Scrimieri, D., & Ratchev, S. (2013). Capture and application of adaptation knowledge on assembly stations. In Proceedings of the 11th IFAC workshop on intelligent manufacturing systems, pp. 87–92.
Specht, D. F. (1992). Enhancements to probabilistic neural networks. In Proceedings international joint conference on neural networks, Vol. 1, pp. 761–768.
Surbier, L. (2010). Problem and interface characterization during ramp-up in the low volume industry. PhD thesis, Institut polytechnique de Grenoble, France.
Terwiesch, C., & Bohn, R. E. (2001). Learning and process improvement during production ramp-up. International Journal of Production Economics, 70, 1–19.
Terwiesch, C., & Xu, Y. (2004). The copy-exactly ramp-up strategy: trading-off learning with process change. IEEE Transactions on Engineering Management, 51(1), 70–84.
Uchino, E., Koga, T., Misawa, H., & Suetake, N. (2013). Tissue characterization of coronary plaque by kNN classifier with fractal-based features of IVUS RF-signal. Journal of Intelligent Manufacturing. doi:10.1007/s10845-013-0793-3.
Wasserman, P. D. (1993). Advanced methods in neural computing. New York: Van Nostrand Reinhold.
Wettschereck, D., Aha, D. W., & Mohri, T. (1997). A review and empirical evaluation of feature weighting methods for a class of lazy learning algorithms. Artificial Intelligence Review, 11, 273–314.
Wilson, D. R., & Martinez, T. R. (1997). Improved heterogeneous distance functions. Journal of Artificial Intelligence Research, 6, 1–34.
Wilson, D. R., & Martinez, T. R. (2000). Reduction techniques for instance-based learning algorithms. Machine Learning, 38, 257–286.
Winkler, H., Heins, M., & Nyhuis, P. (2007). A controlling system based on cause-effect relationships for the ramp-up of production systems. Production Engineering, 1(1), 103–111.
Zangwill, W. I., & Kantor, P. B. (1998). Toward a theory of continuous improvement and the learning curve. Management Science, 44(7), 910–920.
Acknowledgments
This research has been funded by the European Commission as part of the 7th Framework Program under the Grant agreement CP-FP 229208-2, FRAME project.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Scrimieri, D., Oates, R.F. & Ratchev, S.M. Learning and reuse of engineering ramp-up strategies for modular assembly systems. J Intell Manuf 26, 1063–1076 (2015). https://doi.org/10.1007/s10845-013-0839-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10845-013-0839-6
Keywords
Profiles
- Daniele Scrimieri View author profile