Abstract
This paper studies four n-job, m-machine flowshop problems when processing times of jobs on various machines follow certain conditions. The objective is to obtain a sequence, which minimizes total elapsed time under no-idle constraint. Under no-idle constraint, the machines work continuously without idle-interval. We prove two theorems. We introduce simple algorithms without using branch and bound technique. Numerical examples are also given to demonstrate the algorithms.
Similar content being viewed by others
References
I. Adiri D. Pohoryles (1982) ArticleTitleFlowshop/no idle or no wait scheduling to minimize the sum of completion times Naval Research Logistic Quarterly 29 495–504
P.C. Bagga B. Ambika (1997) ArticleTitleSequencing with restrictions in processing times Opsearch 34 IssueID2 116–127
P.C. Bagga N.K. Chakravarti (1968) ArticleTitleOptimal m-stage production schedule CORS Journal 6 61–78
R.A. Dudek O.F. Teuton (1964) ArticleTitleDevelopment of m-stage decision rule for scheduling n jobs through m machines Operations Research 12 471–497
J.‘N.D. Gupta (1969) ArticleTitleA general algorithm for the n×m flowshop scheduling problem The International Journal of Production Research 7 241–247
S.M. Johnson (1954) ArticleTitleOptimal two and three stage production schedule with set up times included Naval Research Logistic Quarterly 1 61–68 Occurrence Handle10.1002/nav.3800010110
L. Narain P.C. Bagga (2003) ArticleTitleMinimize total elapsed time subject to zero total idle time of machines in n×3 flowshop problem Indian Journal of Pure & Applied Mathematics 34 IssueID2 219–228
S.S. Panwalker A.W. Khan (1975) ArticleTitleAn improved branch and bound procedure for the n×m flowshop problems Naval Research Logistic Quarterly 22 787–790
R.D. Smith R.A. Dudek (1967) ArticleTitleA general algorithm for solution of n jobs m machines sequencing problems of the flowshop Operations Research 15 71–82 Occurrence Handle10.1287/opre.15.1.71
W. Szwarc (1977) ArticleTitleSpecial cases of the flowshop problem Naval Research Logistic Quarterly 24 483–492
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Narain, L., Bagga, P.C. Flowshop/No-idle Scheduling to Minimize Total Elapsed Time. J Glob Optim 33, 349–367 (2005). https://doi.org/10.1007/s10898-004-1848-y
Received:
Accepted:
Issue Date:
DOI: https://doi.org/10.1007/s10898-004-1848-y