Abstract
In a recent paper published in Optimization Letters, Montoya et al. (Optim Lett 8:1721–1734, 2014) proposed a branch-and-price approach for a multi-skill project scheduling problem. In that paper, an integer linear programming formulation was first introduced which, unfortunately, has a number of inconsistences. At the interest of mathematical rigor, in this note, we refine such formulation.
References
Correia, I., Lampreia-Lourenço, L., Saldanha-da-Gama, F.: Project scheduling with flexible resources: formulation and inequalities. OR Spec. 34, 635–663 (2012)
Montoya, C., Bellenguez-Morineau, O., Pinson, E., Rivreau, D.: Branch-and-price approach for the multi-skill project scheduling problem. Optim. Lett. 8, 1721–1734 (2014)
Acknowledgments
This work was partially supported by the Fundação para a Ciência e Tecnologia (Portuguese Foundation for Science and Technology) through the projects PEst-OE/MAT/UI0297/2011 (Centro de Matemática e Aplicações) and PEst-OE/MAT/UI0152/ 2013 (Centro de Investigação Operacional).
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Correia, I., Saldanha-da-Gama, F. A note on “branch-and-price approach for the multi-skill project scheduling problem”. Optim Lett 9, 1255–1258 (2015). https://doi.org/10.1007/s11590-014-0804-0
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11590-014-0804-0