Skip to main content
Log in

A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights

  • Original Paper
  • Published:
Optimization Letters Aims and scope Submit manuscript

Abstract

In a recent paper (Lv and Wang, Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights. Optim. Lett., 2021. https://doi.org/10.1007/s11590-020-01670-4), Lv and Wang studied due date proportionate flowshop scheduling problems with position-dependent weights. For common due date and slack due date assignments, they proved that these two problems can be solved in \(O(n\log n)\) time respectively, where n is the number of jobs. For slack due date assignment, there is an error. We will show the error by a counter example and explain why it is incorrect.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Lv, D.Y., Wang, J.B.: Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights. Optim. Lett. (2021). https://doi.org/10.1007/s11590-020-01670-4

    Article  MathSciNet  MATH  Google Scholar 

  2. Panwalkar, S.S., Koulamas, C.: On equivalence between the proportionate flow shop and single-machine scheduling problems. Naval Res. Logist. 62(7), 595–603 (2015)

    Article  MathSciNet  MATH  Google Scholar 

Download references

Acknowledgements

This work was supported by the Fundamental Research Funds for the Central Universities, China (Grant No. N2105020).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jin Qian.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Qian, J., Chang, G. A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights. Optim Lett 16, 2645–2648 (2022). https://doi.org/10.1007/s11590-021-01843-9

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11590-021-01843-9

Keywords

Navigation