Skip to main content
Log in

Estimating the operation time of flexible surface mount placement machines

  • Assembly
  • Published:
Production Engineering Aims and scope Submit manuscript

Abstract

Gantry type component placement machines are widely used in electronics industry due to their accuracy, speed and flexibility. In order to make optimal plans of their usage one has to know the manufacturing time of a given component placement work before the actual processing. This presupposes the use of a reliable machine simulator. In the present article, discrete-event simulation is applied to predict component placement times of gantry type machines. The generic simulator model is based on a circumstantial analysis of the time factors by the means of observing and measuring the times of operations performed by the machine. As a result of this, very high accuracy is achieved; the operation times predicted by the simulator are for a particular machine type (Universal Instruments GC-60D) in range ±1 % from the observed operation times.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10

Similar content being viewed by others

References

  1. Ball MO, Magazine MJ (1988) Sequencing of insertions in printed circuit board assembly. Oper Res 36(2):192–201

    Article  MathSciNet  Google Scholar 

  2. Leipälä T, Nevalainen O (1989) Optimization of the movements of a component placement machine. Eur J Oper Res 38:167–177

    Article  MATH  Google Scholar 

  3. Johnsson M (1999) Operational and tactical level optimization in printed circuit board assembly, TUCS dissertations no 16

  4. Knuutila T, Hirvikorpi M, Johnsson M, Nevalainen O (2004) Grouping PCB assembly jobs with feeders of several types. Int J Flex Manufact Syst 16(2):151–167 (17)

    Google Scholar 

  5. Chen W-S, Chyu C-C (2002) Reduction of printed circuit board group assembly time through the consideration of efficiency loss of placement time. Assem Autom 22(4):360–370

    Article  Google Scholar 

  6. Williams SK, Magazine MJ (2007) Heuristic approaches for batching jobs in printed circuit board assembly. Comput Oper Res 34(4):1943–1962

    Article  MATH  Google Scholar 

  7. Ayob M, Cowling P, Kendall G (2002) Optimisation for surface mount placement machines. In: Proceedings of IEEE ICIT’02, Bangkok, Thailand

  8. Grunow M, Gunther H-O, Schleusener M, Yilmaz IO (2004) Operational planning for collect-and-place machines in PCB assembly. Comput Indus Eng 47:409–429

    Article  Google Scholar 

  9. Kulak O, Yilmaz IO, Gunther HO (2007) PCB assembly scheduling for collect-and-place machines using genetic algorithms. Int J Prod Res 45(17):3949–3969

    Article  MATH  Google Scholar 

  10. Ho W, Ji P, Wu Y (2007) A heuristic approach for component scheduling on a high-speed PCB assembly machine. Prod Plan Control 18(8):655–665

    Article  Google Scholar 

  11. Crama Y, van de Klundert J, Spieskma FCR (2002) Production planning problems in printed circuit board assembly. Dis Appl Math 123(1–3):339–361

    Article  MathSciNet  MATH  Google Scholar 

  12. Laakso T, Johnsson M, Johtela T, Smed J, Nevalainen O (2002) Estimating the production times in PCB assembly. J Electron Manufact 11(2):161–170

    Article  Google Scholar 

  13. Vainio F, Maier M, Knuutila T, Alhoniemi E, Johnsson M, Nevalainen OS (2009) Estimating printed circuit board assembly times using neural networks. Int J Prod Res. doi:10.1080/00207540802572574

  14. ASM Assembly Systems, http://www.siplace.com/ (Jan 4th, 2012)

  15. vPlan by Mentor Graphics, http://www.mentor.com/pcb-manufacturing-assembly/products/vplan/ (Jan 4th, 2012)

  16. Law AM, Kelton WD (2000) Simulation modeling and analysis, 3rd edn. McGraw-Hill, New York

    Google Scholar 

  17. Ayob M, Kendall G (2008) A survey of surface mount device placement machine optimization: machine classification. Eur J Oper Res 186:893–914

    Article  Google Scholar 

  18. Ahmadi J, Grotzinger S, Johnson D (1988) Component allocation and partitioning for a dual delivery placement machine. Oper Res 36(2):176–191

    Article  Google Scholar 

  19. Knuutila T, Puranen M, Johnsson M, Nevalainen O (2001) Three perpectives for solving the job grouping problem. Int J Prod Res 39(18):4261–4280

    Article  MATH  Google Scholar 

  20. Hiller MS, Brandeau ML (2001) Cost minimization and workload balancing in printed circuit board assembly. IIE Trans 33:547–557

    Google Scholar 

  21. Altinkemer K, Kazaz B, Köksalan M, Moskowitz H (2001) Optimization of printed circuit board manufacturing: integrated modeling and algorithms. Eur J Oper Res 124:409–421

    Article  Google Scholar 

  22. Csaszar P, Tirpak TM, Nelson PC (2000) Optimization of a high-speed machine using tabu search algorithms. Ann Oper Res 96:125–147

    Article  MATH  Google Scholar 

  23. Ellis KP, Kobza JE, Vittes FJ (2002) Development of a placement time estimator function for a turret style surface mount placement machine. Robot Comput Int Manufact 18:241–254

    Article  Google Scholar 

  24. Tirpak TM, Mohapatra PK, Nelson PC, Rajbhandari RR (2002) A generic classification and object-oriented simulation toolkit for SMT assembly equipment. IEEE Trans Syst Man Cybernetics 32(1):104–122

    Article  Google Scholar 

  25. Csaszar P, Tirpak TM, Nelson PC (1999) Object oriented design for an automated high-speed modular placement machine family. Simulation 973:341–351

    Article  Google Scholar 

  26. Operation Manual, Modular Placement Machine BM221, E33OEC-00-011-E0, Panasonic

  27. Reference Manual, Modular Placement Machine BM221, E33REC-00-011-D0, Panasonic

  28. SMD High Speed Placement System, Siplace 80 S-20, Edition 5 1199-S-20 600-e, Siemens

  29. Alternative SMT, http://www.alternativesmt.com/equipment/Fuji-NXT-Feeders-Fuji.asp.2007

  30. Patent Storm, Stick Feeder, http://www.patentstorm.us/patents/5328317.html (12 June 1994)

  31. Patent Storm, Stack tube feeder, http://www.patentstorm.us/patents/5733093.html (31 March 1998)

  32. Patent Storm, Vibratory feeder, http://www.patentstorm.us/patents/5335779.html (9 August 1994)

  33. Bulk feeder, http://www.murata.com/bulk/about2.html, Murata Manufacturing Co, Ltd. 2007

  34. General Specification, Platform Feeders, GS-412-02, Universal Instruments Corporation

  35. General Specification, Genesis Platform GC-60D, GS-410-02 Rev. B, Universal Instruments Corporation

  36. General Specification, AdVantis (4984B AdVantis Platform AX-72e, AI-42e), GS-415-01, Universal Instruments Corporation

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Kai Kallio.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kallio, K., Johnsson, M. & Nevalainen, O.S. Estimating the operation time of flexible surface mount placement machines. Prod. Eng. Res. Devel. 6, 319–328 (2012). https://doi.org/10.1007/s11740-012-0380-z

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11740-012-0380-z

Keywords

Navigation