Risk management of NPPs using risk monitors

  • Original Article
  • Published:
International Journal of System Assurance Engineering and Management Aims and scope Submit manuscript

Abstract

In nuclear power plants (NPPs), safety is the major concern. Probabilistic safety assessment (PSA) has become a key tool as on today to identify and understand NPP vulnerabilities. PSA models have been successfully employed during design evaluation to assess weak links and carry out design modifications to improve system reliability and safety. As a result of the availability of these PSA studies, one can make use of them to enhance plant safety and to operate the plants in the most efficient manner. This necessitates development of software tools like living PSA, risk monitor etc. Risk monitor is a PC based tool, which computes the real time safety level based on the actual status of systems and components and assists plant personnel and regulatory authorities to manage day-to-day activities and can provide solutions to various regulatory decision making issues. This paper discusses various modules and data flow diagrams of risk monitor and also discusses how common cause failures are treated in risk monitor. In risk monitor, risk is subjected to the change in the state of the system, which in turn depends on the state of the components and these are explained with a case study.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6

Similar content being viewed by others

References

  • Regulatory Guide-1.174 (2008) An Approach for using probabilistic risk assessment in risk-informed decisions on plant-specific changes to the licensing basis. USNRC, Washington, DC

  • EPRI NP-5613 (1988) Procedures for treating common cause failures in safety and reliability studies, Vol. 1, NUREG/CR-4780

  • Hari Prasad M, Vinod Gopika, Saraf RK, Ghosh AK (2005) Application of PSA in risk informed decision making. Paper presented at the international conference on reliability, safety and hazards, Mumbai, 1–3 December 2005

  • Hari Prasad M, Gopika V, Saraf RK, Ghosh AK (2006) Risk monitor a tool for operational safety assessment, Report BARC/2006/E/016, July 2006

  • IAEA-TECDOC-1106 (1999) Living probabilistic safety assessment (LPSA). IAEA, Vienna

    Google Scholar 

  • IAEA-TECDOC-737 (1994) Advances in reliability analysis and probabilistic safety assessment for nuclear power reactors. IAEA, Vienna

    Google Scholar 

  • Nakai R, Kani Y (1991) A Living PSA system LIPSAS for an LMFBR. Paper presented at the international symposium on the use of PSA for operational safety, PSA’91, Vienna, 3–7 June 1991

  • RG1.177 (2002) An approach for plant-specific, risk-informed decision making : technical specifications. US Nuclear Regulatory Commission, Washington, DC

  • Saraf RK, Hari Prasad M, Ghosh AK (2005) Treatment of common cause failures in risk monitor”. Paper presented in the international conference on reliability and safety engineering, Bhubaneswar, 21–23 December 2005

  • Smith Curtis L (1998) Calculating conditional core damage probabilities for nuclear power plant operations. Reliab Eng Syst Saf 59:299–307

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. Hari Prasad.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Hari Prasad, M., Vinod, G. & Sanyasi Rao, V.V.S. Risk management of NPPs using risk monitors. Int J Syst Assur Eng Manag 6, 191–197 (2015). https://doi.org/10.1007/s13198-014-0295-5

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13198-014-0295-5

Keywords

Navigation