Abstract
Value stream mapping (VSM) is an important improvement initiative in the lean environment that can be used to boost manufacturing performance by eliminating wastes (Ws). In this study, authors have identified manufacturing related critical wastes for enhancing the manufacturing competitiveness with the help of industry experts and literature. For the effective VSM implementation, these wastes have categorised into three groups named as; seven deadly waste; knowledge waste and administrative waste. The goal of present work is to understand the mutual interaction between these wastes and to identify the ‘driving wastes’ (i.e. which influence the other wastes) and the ‘dependent wastes’ (i.e. which are influenced by others). The research theme has divided into three segments; (1) identified the wastes from literature and industry experts, and conducted interviews with experts through a questionnaire in the form of waste relationship matrix (2) prepared an ISM based framework and finally, (3) cluster analysis has done through fuzzy MICMAC. Interpretive structural modeling has been used to analyse the relationships among these manufacturing wastes. Fuzzy MICMAC (cross-impact matrix multiplication applied to classification) has been used to find out driving and the dependence power of identified waste. To determine the driving and the dependence power of various wastes the final results of interpretive structural modeling are used as input to the fuzzy MICMAC analysis. The finding of this study reveals that overproduction (W4) and unclear customer (W11) are a matter of concern and need maximum attention for enhancing manufacturing performance. The enterprises and the decision-makers can be benefited from this model to identify which manufacturing wastes are performing as the most deleterious.
Similar content being viewed by others
References
AbuShaaban MS (2012) Wastes Elimination as the First Step for Lean Manufacturing An Empirical Study for Gaza Strip Manufacturing Firms. A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree of Master of Business Administration
Alarcon LF (1997) Tools for the identification and reduction of waste in construction projects. Lean Constr 5:365–377
Attri R, Dev N, Sharma V (2013a) Interpretive structural modelling (ISM) approach: an overview. Res J Manag Sci 2(2):3–8
Attri R, Grover S, Dev N, Kumar D (2013b) An ISM approach for modelling the enablers in the implementation of total productive maintenance (TPM). Int J Syst Assur Eng Manag 4(4):313–326
Bauch C (2004) Lean product development: making waste transparent
Berg A, Ohlsson F (2005) Lean manufacturing at Volvo Truck Production Australia: development of an implementation strategy
Bhosale VA, Kant R (2016) An integrated ISM fuzzy MICMAC approach for modelling the supply chain knowledge flow enablers. Int J Prod Res 54(24):7374–7399
Dewangan DK, Agrawal R, Sharma V (2015) Enablers for competitiveness of Indian manufacturing sector: an ISM-fuzzy MICMAC analysis. Procedia Soc Behav Sci 189:416–432
Dinis-Carvalho J, Moreira F, Bragança S, Costa E, Alves A, Sousa R (2015) Waste identification diagrams. Prod Plan Control 26(3):235–247
Dube A, Gawande R (2016a) ISM-fuzzy MICMAC approach for analysis of GSCM enablers. Int J Logist Syst Manag 24(4):426–451
Dube AS, Gawande RS (2016b) Analysis of green supply chain barriers using integrated ISM-fuzzy MICMAC approach. Benchmarking Int J 23(6):1558–1578
Dubey R, Ali SS (2014) Identification of flexible manufacturing system dimensions and their interrelationship using total interpretive structural modelling and fuzzy MICMAC analysis. Glob J Flex Syst Manag 15(2):131–143
Dubey R, Singh T (2015) Understanding complex relationship among JIT, lean behaviour, TQM and their antecedents using interpretive structural modelling and fuzzy MICMAC analysis. TQM J 27(1):42–62
Duperrin J-C, Godet M (1973) Méthode de hiérarchisation des éléments d’un système: essai de prospective du système de l’énergie nucléaire dans son contexte sociétal: CEA
Durst S, Aggestam L, Ferenhof HA (2015) Understanding knowledge leakage: a review of previous studies. Vine 45(4):568–586
El-Namrouty K, Abushaaban MS (2013) Seven wastes elimination targeted by lean manufacturing case study, gaza strip manufacturing firms. Int J Econ Financ Manag Sci 1(2):68–80
Eswaramoorthi M, Kathiresan G, Prasad P, Mohanram P (2011) A survey on lean practices in Indian machine tool industries. Int J Adv Manuf Technol 52(9–12):1091–1101
Ferenhofa HA, Durstb S, Seliga PM (2015) Knowledge waste in organizations: a review of previous studies. Braz J Oper Prod Manag 12(1):160–178
Ford H (1926) Today and tomorrow. Doubleday, Garden City, NY. Reprint Edition, Page & Company, Productivity Press, Portland, OR
Gopinath S, Freiheit TI (2012) A waste relationship model and center point tracking metric for lean manufacturing systems. IIE Trans 44(2):136–154
Gorane SJ, Kant R (2013) Modelling the SCM enablers: an integrated ISM-fuzzy MICMAC approach. Asia Pac J Mark Logistics 25(2):263–286
Gunasekaran A, Cecille P (1998) Implementation of productivity improvement strategies in a small company. Technovation 18(5):311–320
Herron C, Braiden PM (2006) A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies. Int J Prod Econ 104(1):143–153
Hines P, Rich N (1997) The seven value stream mapping tools. Int J Oper Prod Manag 17(1):46–64
Hornby AS, Wehmeier S, Ashby M (1995) Oxford advanced learner’s dictionary, vol 1428. Oxford University Press, Oxford
Hou J-L, Tsai AW-J (2008) Knowledge reuse enhancement with motional visual representation. IEEE Trans Knowl Data Eng 20(10):1424–1439
Jain V, Raj T (2015) Modeling and analysis of FMS flexibility factors by TISM and fuzzy MICMAC. Int J Syst Assur Eng Manag 6(3):350–371
Jasti NVK, Sharma A (2014) Lean manufacturing implementation using value stream mapping as a tool: a case study from auto components industry. Int J Lean Six Sigma 5(1):89–116
Kandasamy WV, Smarandache F, Ilanthenral K (2007) Elementary fuzzy matrix theory and fuzzy models for social scientists: Infinite Study
Kannan G, Pokharel S, Kumar PS (2009) A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider. Resour Conserv Recycl 54(1):28–36
Kato J (2005) Development of a process for continuous creation of lean value in product development organizations. Massachusetts Institute of Technology
Khan U, Haleem A (2012) Smart organisations: modelling of enablers using an integrated ISM and fuzzy-MICMAC approach. Int J Intell Enterp 1(3–4):248–269
Khan MI, Khan U, Haleem A (2014) Corporate social responsibility: modelling of critical factors using an Integrated ISM and Fuzzy-Micmac approach. Int J Global Bus Competitiveness 9(1):1–13
Khurum M, Petersen K, Gorschek T (2014) Extending value stream mapping through waste definition beyond customer perspective. J Soft Evol Process 26(12):1074–1105
Kilpatrick AM (1997) Lean manufacturing principles: a comprehensive framework for improving production efficiency. Massachusetts Institute of Technology
Koskela L (1992) Application of the new production philosophy to construction, vol 72. Stanford University, Stanford
Kumar S, Gorane S, Kant R (2015) Modelling the supplier selection process enablers using ISM and fuzzy MICMAC approach. J Bus Ind Mark 30(5):536–551
Liker JK (2004) The toyota way. Esensi
Liker JK, Morgan JM (2006) The Toyota way in services: the case of lean product development. Acad Manag Perspect 20(2):5–20
Locher DA (2008) Value stream mapping for lean development: a how-to guide for streamlining time to market. CRC Press, Boca Raton
Love P, Mandel P, Li H (1997) A systematic approach to modelling the causes and effects of rework in construction. Paper presented at the Proceedings of the First International Conference on Construction Industry Development: Building the Future Together
Mannan B, Khurana S, Haleem A (2016) Modeling of critical factors for integrating sustainability with innovation for Indian small-and medium-scale manufacturing enterprises: an ISM and MICMAC approach. Cogent Bus Manag 3(1):1140318
Marchwinski C, Shook J (2003) Lean lexicon: a graphical glossary for lean thinkers.Lean Enterprise Institute
McManus HL (2005) Product Development Value Stream Mapping (PDVSM) Manual. The Lean Aerospace Initiative, Cambridge
Meyers FE, Stewart JR (2002) Motion and time study for lean manufacturing. Pearson College Division, London
Millard RL (2001) Value stream analysis and mapping for product development Thesis (S.M.). Aironautics and Astronautics, Massachusetts Institute of Technology, Cambridge, MA
Monden Y (2011) Toyota production system: an integrated approach to just-in-time. CRC Press, Boca Raton
Morgan JM (2002) High performance product development: a systems approach to a lean product development process
Morgan JM, Liker JK (2006) The Toyota product development system: integrating people, process, and technology. Productivity Press, New York
Oehmen J, Rebentisch E (2010) Waste in lean product development: lean advancement initiative
Ohno T (1988) Toyota production system: beyond large-scale production. CRC Press
Panizzolo R, Garengo P, Sharma MK, Gore A (2012) Lean manufacturing in developing countries: evidence from Indian SMEs. Prod Plan Control 23(10–11):769–788
Patidar L, Soni VK, Soni PK (2016) Continuous improvement philosophy for manufacturing productivity: critical review. Indian J Eng 13(33):300–310
Pavnaskar S, Gershenson J, Jambekar A (2003) Classification scheme for lean manufacturing tools. Int J Prod Res 41(13):3075–3090
Poduval PS, Pramod V (2015) Interpretive structural modeling (ISM) and its application in analyzing factors inhibiting implementation of total productive maintenance (TPM). Int J Qual Reliab Manag 32(3):308–331
Poppendieck M (2002) Principles of lean thinking. Technical Report, Poppendieck LLC
Rajam Ramaswamy N, Selladurai V, Gunasekaran A (2002) Just-in-time implementation in small and medium enterprises. Work Study 51(2):85–90
Ramesh V, Kodali R (2012) A decision framework for maximising lean manufacturing performance. Int J Prod Res 50(8):2234–2251
Rother M, Shook J (1998) Learning to see: value stream mapping to create value and eliminate muda. v. 1.1. Oct., The Lean Enterprise Inst., Brookline, Mass
Russell RS, Taylor B (2009) Operations management: creating value along the supply chain. Wiley, Hoboken
Sarkar D, Panchal S (2015) Integrated interpretive structural modeling and fuzzy approach for project risk management of ports. Int J Constr Proj Manag 7(1):17
Serrano Lasa I, Castro RD, Laburu CO (2009) Extent of the use of Lean concepts proposed for a value stream mapping application. Prod Plan Control 20(1):82–98
Slack RA (1998) The application of lean principles to the military aerospace product development process. Doctoral dissertation, Massachusetts Institute of Technology
Seth D, Seth N, Goel D (2008) Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context. J Manuf Technol Manag 19(4):529–550
Sharma H, Gupta A (1995) The objectives of waste management in India: a futures inquiry. Technol Forecast Soc Chang 48(3):285–309
Shingo S (1992) The Shingo production management system: improving process functions. Productivity Press, New York
Sindhu S, Nehra V, Luthra S (2016) Identification and analysis of barriers in implementation of solar energy in Indian rural sector using integrated ISM and fuzzy MICMAC approach. Renew Sustain Energy Rev 62:70–88
Venkatesh V, Paluri R, Bhattacharya S (2016) Sustenance of Indian apparel manufacturing industry in post MFA period-a strategic analysis. Int J Proc Manage Benchmarking 6(3):343–365
Villarreal B (2012) The transportation value stream map (TVSM). Eur J Ind Eng 6(2):216–233
Ward AC, Sobek D II (2007) Lean product and process development. Lean Enterprise Institute. Inc., Cambridge
Womack JP, Jones DT (1996) Lean thinking: banish waste and create wealth in your corporation. Simon and Schuster, New York
Yousuf MI (2007) Using experts’ opinions through Delphi technique. Pract Assess Res Eval 12(4):1–8
Acknowledgements
The authors would like to thank experts from industry and academia for giving their valuable opinion regards wastes identification under VSM. Finally, authors thank anonymous reviewers for their comments and suggestions on the earlier version of this article.
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
The authors declare that they have no possible conflicts of interests.
Rights and permissions
About this article
Cite this article
Patidar, L., Soni, V.K. & Soni, P.K. Manufacturing wastes analysis in lean environment: an integrated ISM-fuzzy MICMAC approach. Int J Syst Assur Eng Manag 8 (Suppl 2), 1783–1809 (2017). https://doi.org/10.1007/s13198-017-0669-6
Received:
Revised:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s13198-017-0669-6