Skip to main content
Log in

Scheduling Stochastic jobs on a repairable machine with general phase type uptime

  • Published:
Mathematical Methods of Operations Research Aims and scope Submit manuscript

Abstract

A set of jobs, with stochastic processing times, is to be processed on a machine which is subject to breakdown and repair. The machine’s uptime is assumed to have a general phase type distribution, the processing time of each job and the repair times of the machine are generally considered as arbitrary random variables. Simple permutation policies depending on both machine parameters and jobs processsing distributions are derived to minimize in expectation of the weighted flow times, the weighted number of tardy jobs and the weighted sum of the job delays. Some simple optimal schedules for uptimes with hyper-exponential distribution and Erlang distribution are deduced from the general results.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Wei Li.

Additional information

Manuscript received: March 2004/Final version received: October 2004

Rights and permissions

Reprints and permissions

About this article

Cite this article

Li, W., Alfa, A.S. Scheduling Stochastic jobs on a repairable machine with general phase type uptime. Math Meth Oper Res 61, 399–417 (2005). https://doi.org/10.1007/s001860400411

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s001860400411

Keywords

Navigation