Skip to main content
Log in

Single machine scheduling with deadlines and increasing rates of processing times

  • Original articles
  • Published:
Acta Informatica Aims and scope Submit manuscript

Abstract.

The makespan, flow time and maximum lateness problems of scheduling a set of tasks with deadlines and increasing rates of processing times on a single machine are considered in this paper. We first show that, when the increasing rates of processing time are identical, the makespan problem is equivalent to the corresponding flow time problem. Both problems are solvable in \(O(n^5)\) time by a dynamic programming algorithm. As an application of the dynamic programming algorithm, we demonstrate that the corresponding maximum lateness problem can be solved in \(O(n^6\log n)\) time. We then show that the general makespan problem is strongly NP-complete. Thus, both the corresponding flow time problem and maximum lateness problem are also strongly NP-complete.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Received: 17 November 1997 / 24 August 1999

Rights and permissions

Reprints and permissions

About this article

Cite this article

Cheng, T., Ding, Q. Single machine scheduling with deadlines and increasing rates of processing times. Acta Informatica 36, 673–692 (2000). https://doi.org/10.1007/s002360050170

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s002360050170

Keywords

Navigation