Abstract
We propose an exact branch-and-bound algorithm for the problem of maximizing the minimum machine completion time on identical parallel machines. The proposed algorithm is based on tight lower and upper bounds as well as an effective symmetry-breaking branching strategy. Computational results performed on a large set of randomly generated instances attest to the efficacy of the proposed algorithm.
Similar content being viewed by others
References
Azar Y, Epstein L (1997) On-line machine covering. Lect Notes Comput Sci 1284:23–36
Csirik J, Kellerer H, Woeginger G (1992) The exact LPT-bound for maximizing the minimum completion time. Oper Res Lett 11:281–287
Dell’Amico M, Martello S (1995) Optimal scheduling of tasks on identical parallel processors. ORSA J Comput 7:191–200
Deuermeyer BL, Friesen DK, Langston MA (1982) Scheduling to maximize the minimum processor finish time in a multiprocessor system. SIAM J Algorithms Discret Methods 3:190–196
Haouari M, Gharbi A (2004) Lower bounds for scheduling on identical parallel machines with heads and tails. Ann Oper Res 129:187–204
Haouari M, Gharbi A, Jemmali M (2006) Tight bounds for the identical parallel machine scheduling problem. Int Trans Oper Res 13:529–548
Lawler EL, Lenstra JK, Rinnooy Kan AHG, Shmoys D (1993) Sequencing and scheduling: algorithms and complexity. In: Graves SS, Rinnooy Kan AHG, Zipkin P (eds) Handbooks in operations research and management science, vol 4, pp 445–522
Pisinger D (2003) Dynamic programming on the word RAM. Algorithmica 35:437–459
Sherali HD, Smith JC (2001) Improving discrete model representations via symmetry considerations. Manage Sci 47:1396–1407
Tan ZY, He Y (2002) Ordinal on-line scheduling for maximizing the minimum machine completion time. J Comb Optim 6:199–206
Woeginger GJ (1997) A polynomial time approximation scheme for maximizing the minimum completion time. Oper Res Lett 20:149–154
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Haouari, M., Jemmali, M. Maximizing the minimum completion time on parallel machines. 4OR 6, 375–392 (2008). https://doi.org/10.1007/s10288-007-0053-5
Received:
Revised:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10288-007-0053-5