Abstract
This paper studies the scheduling of lots (jobs) of different product types (job family) on parallel machines, where not all machines are able to process all job families (non-identical machines). A special time constraint, associated to each job family, should be satisfied for a machine to remain qualified for processing a job family. This constraint imposes that the time between the executions of two consecutive jobs of the same family on a qualified machine must not exceed the time threshold of the family. Otherwise, the machine becomes disqualified. This problem comes from semiconductor manufacturing, when Advanced Process Control constraints are considered in scheduling problems. To solve this problem, two Mixed Integer Linear Programming models are proposed that use different types of variables. Numerical experiments show that the second model is much more effective, and that there is a trade-off between optimizing the scheduling objective and maximizing the number of machines that remain qualified for the job families. Two heuristics are also presented and studied in the numerical experiments.
Similar content being viewed by others
References
Detienne, B., Dauzère-Pérès, S., & Yugma, C. (2011). Scheduling jobs on parallel machines to minimize a regular step total cost function. Journal of Scheduling, 14(6), 523–538.
Kubiak, W., Lou, S. X. C., & Wang, Y. (1996). Mean flow time minimization in reentrant job shops with a hub. Operations Research, 44, 764–776.
Kumar, P. R. (1996). Re-entrant lines. Queuing Networks, 13, 87–110.
Li, L., & Qiao, F. (2008). The impact of the qual-run requirements of APC on the scheduling performance in semiconductor manufacturing. In 4th IEEE conference on automation science and engineering (pp. 242–246).
Moench, L., Fowler, J. W., Dauzère-Pérès, S., Mason, S. J., & Rose, O. (2011). A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling, 14(6), 583–599.
Musacchio, J., Rangan, S., Spanos, C., & Poolla, K. (1997). On the utility of run to run control in semiconductor manufacturing. In IEEE international symposium on semiconductor manufacturing (ISSM 1997) (pp. D9–D12).
Yiwei, C., Kutanoglu, E., Hasenbein, J., & Qin, J. (2010). Single-machine scheduling with advanced process control constraints. Journal of Scheduling, 1–15.
Webster, S. T. (1997). The complexity of scheduling job families about a common due date. Operations Research Letters, 2, 65–74.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Obeid, A., Dauzère-Pérès, S. & Yugma, C. Scheduling job families on non-identical parallel machines with time constraints. Ann Oper Res 213, 221–234 (2014). https://doi.org/10.1007/s10479-012-1107-4
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10479-012-1107-4