Abstract
Previously, ASCI (Automation System for Curtain-wall Installation) which combined with a multi-DOF manipulator to a mini-excavator was developed and applied on construction site. As result, the operation by one operator and more intuitive operation method are proposed to improve ASCI's operation method which need one person with a remote joystick and another operating an excavator. The human-robot cooperative system can cope with various and untypical constructing environment through the real-time interacting with a human, robot and constructing environment simultaneously. The physical power of a robot system helps a human to handle heavy construction materials with relatively scaled-down load. Also, a human can feel and response the force reflected from robot end effecter acting with working environment. This paper presents the feasibility study regarding the application of the proposed human-robot cooperation control for construction robot through experiments on a 2DOF manipulator.
Similar content being viewed by others
References
Choi, H.S., Han, C.S., Lee, K.Y., and Lee, S.H. 2005. Development of hybrid robot for construction works with pneumatic actuator. Automation in Construction, 14(4):452–459.
Fukuda, T., Fujisawa, Y., et al. 1991a. A new robotic manipulator in construction based on man-robot cooperation work. In Proc. of the 8th International Symposium on Automation and Robotics in Construction., pp. 239–245.
Fukuda, T., Fujisawa, Y., Kosuge, K., et al 1991b. Manipulator for Man-Robot Cooperation. International Conference on Industrial Electronics, Control and Instrumentation, 2:996–1001.
Fukuda, T., Fujisawa, Y., Arai, F., et al. 1991c. Study on man-robot cooperation work-type of manipulator. 1st Report, Mechanism and Control of Man-Robot Cooperation Manipulator, Trans. Of the JSME, pp. 160–168
Gambao, E., Balaguer, C., and Gebhart, F. 2000. Robot assembly system for computer-integrated construction. Automation in Construction, 9(5/6):479–487.
Hogan, N. 1985. Impedance control: An approach to manipulation, Part I-III. ASME Journal of Dynamic Systems, Measurements and Control, 107:1–24.
Isao S., Hidetoshi O., Nobuhiro T., and Hideo T. 1996. Development of automated exterior curtain wall installation system. International Symposium on Automation and Robotics in Construction (ISARC’96), Tokyo, Japan.
Kazerooni, H. 1989. Human/robot interaction via the transfer of power and information signals – part I: Dynamics and control analysis. In IEEE Proc. of IEEE International Conference on Robotics and Automation, pp. 1632–1640.
Kazerooni, H. 1989. Human/robot interaction via the transfer of power and information signals – part II: An experimental analysis. In IEEE Proc. of IEEE International Conference on Robotics and Automation, pp. 1641–1647.
Kazerooni, H. and Mahoney, S.L. 1991. Dynamics and control of robotic systems worn by humans. ASME Journal of Dynamic Systems, Measurement and Control, 133(3):379–387
Kosuge K., Fujisawa, Y., and Fukuda, T. 1993. Mechanical system control with man-machine-environment interactions. In Proc. of IEEE International Conference on Robotics and Automation, pp. 239–244.
Lee, S.Y., Lee, K.Y., Park, B.S., and Han, C.S. 2006. A Multidegree-of-freedom manipulator for curtain-wall installation. Journal of Field Robotics, 23(5):347–360.
Masatoshi, H., Yukio, H., Hisashi, M., Kinya, T., Sigeyuki, K., Kohtarou, M., Tomoyuki, T., and Takumi, O. 1996. Development of interior finishing unit assembly system with robot: WASCOR IV research project report. Automation in Construction, 5(1):31–38.
Miller, J.S. 1968. The Myotron—A Servo-controlled exoskeleton for the measurement of muscular kinetics. Cornell Aeronautical Laboratory Report VO-2401-E-1.
Mosher, R.S. 1967. Handyman to Hardiman. Automotive Engineering Congress. SME670088
Ostoja-Starzewski, M. and Skibniewski, M. 1989. A master-slave manipulator for excavation and construction tasks. Robotics and Autonomous Systems, 4(4):333–337.
Roozbeh, K. 1985. Advanced robotics in civil engineering and construction. In International Conference on Advanced Robotics (ICRA ’85), St. Louis, Missouri.
Santos, P.G., Estremera, J., Jimenez, M.A., Garcia, E., and Armada, M. 2003. Manipulators helps out with plaster panels in construction. The Industrial Robot, 30(6):508–514.
Skibniewski, M.J. 1988. Robotics in Civil Engineering. Van Nostrand Reinhold, New York.
Skibniewski, M.J. and Wooldridge, S.C. 1992. Robotic materials handling for automated building construction technology. Automation in Construction, 1(3):251–266.
Warszawski, A. 1985. Economic implications of robotics in building. Building and Environment, 20(2):73–81.
Acknowledgment
This work was supported by the SAMSUNG CORPORATION and the SRC/ERC program of MOST (grant#R11-2005-056-03003-0).
Author information
Authors and Affiliations
Corresponding authors
Rights and permissions
About this article
Cite this article
Lee, S.Y., Lee, K.Y., Lee, S.H. et al. Human-robot cooperation control for installing heavy construction materials. Auton Robot 22, 305–319 (2007). https://doi.org/10.1007/s10514-006-9722-z
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10514-006-9722-z